Jason Lim · Johor Bahru property advisor

Johor Bahru Condo Ages by Area (2026): When 63 Buildings Were Completed, from 1989 to 2025

中文 · Bahasa Melayu · Bahasa Indonesia

By Jason Lim, REN 84424 · IQI Realty · Checked on 21 November 2026

Completed condos in greater Johor Bahru range from a 1989 tower in Tampoi to blocks finished in December 2025. Of 63 buildings on my project pages (checked October–November 2026), 13 were completed in 2006 or earlier, 22 in 2007–2016, 20 in 2017–2021 and 8 in 2022–2025. The oldest sit in Stulang, Larkin, Tampoi and Permas Jaya.

Key facts (checked November 2026)

  • Oldest on my pages: Dwi Mahkota in Tampoi (1989), then Aloha Tower in Kolam Ayer and Pan Vista in Permas Jaya (both 1994) and Putri Indah in Stulang (1995).
  • Newest completed: Trellis Residences in the city centre (December 2025), Summit @ Lagoon Residences in Senibong (CCC 9 December 2024) and Aliff Heights in Tampoi (2024).
  • Iskandar Puteri is young: none of the 14 buildings in its Medini, Puteri Harbour, Bukit Indah, Horizon Hills and Forest City rows was completed before 2013; Medini and Puteri Harbour run from 2015 to 2019.
  • Before and after the CCC: 13 of the 63 buildings were completed before 2007, when the council’s Certificate of Fitness was replaced by the CCC from 12 April 2007.
  • Next keys: towers now being built are due from May 2027 to March 2031, on sale agreements, ministry records or developer dates (checked October 2026).
  • What the years are: completion years as recorded on 69 of my own project pages, from developer, ministry and listing-portal records; where records disagree, the table says so.

This page is the age companion to my JB condo unit sizes by area, freehold and leasehold by area and JB condo maintenance fees by area tables. It answers one question for each building: when was it finished, and how old is it in 2026? Every building links to its project page, where you can see the sources behind the year.

How old are the condos in each Johor Bahru area in 2026?

Area by area, the 63 completed buildings on my project pages range from about 1 to 37 years old in 2026. Stulang, Larkin, Tampoi and Permas Jaya hold most of the buildings over 20 years old, while JB city centre, Medini, Puteri Harbour and Bukit Indah are mostly under 13 years old.

Area (area page or guide)BuildingsCompletedAge in 2026 (years)OldestNewest
JB city centre, Bukit Chagar & Tanjung Puteri72015–2025About 1–11Skysuites @ Meldrum Hills (2015)Trellis Residences (Dec 2025)
Stulang, Kolam Ayer & Kampung Bahru31994–2007About 19–32Aloha Tower (1994)Palm Garden (2007)
Larkin, Taman Abad, Bayu Puteri & Kebun Teh81999–2023About 3–27Datin Halimah (1999)Space Residency (2023)
Danga Bay32014–2019About 7–12Tropez Residences (2014)Bora Residences (2019)
Mount Austin, Tebrau, Taman Molek & Austin Heights82009–2021About 5–17Tebrau City Residences (2009)D’Lagoon (2021)
Skudai, Tampoi, Kempas & Perling91989–2024About 2–37Dwi Mahkota (1989)Aliff Heights (2024)
Kulai (Bandar Putra)22005–2017About 9–21Sri Putra Apartment (2005)D’Putra Suites (2017)
Permas Jaya, Seri Alam, Kota Puteri & Senibong91994–2024About 2–32Pan Vista (1994)Summit @ Lagoon Residences (CCC Dec 2024)
Medini42015–2019About 7–11One Medini (2015)Elysia Park Residence (CCC 2019)
Puteri Harbour32015–2018About 8–11Imperia (2015)Southern Marina Residences (Dec 2018)
Bukit Indah, Nusa Sentral & Nusa Bayu42013–2023About 3–13The Sky Executive Suites (2013)Sky Trees (2023)
Horizon Hills & East Ledang22013–2016About 10–13Fairway Suites (2013)Residensi Ledang (2016)
Forest City12017About 9Nigella Park (2017)Same building
All 13 areas631989–2025About 1–37Dwi Mahkota (1989)Trellis Residences (Dec 2025)
Completed condos, serviced apartments and apartments on 63 of my project pages, grouped by area; completion years as each page records them (pages checked October–November 2026, all read 21 November 2026). Age = 2026 minus the completion year. A sample, not every building in each area.

The full list below gives every building with its home type, tenure, completion year and age in 2026, grouped by area and sorted from oldest to newest. “Age” is 2026 minus the completion year, so a building finished late in a year is a few months younger than shown.

AreaBuilding (project page)Home typeTenureCompletedAge in 2026 (years)Page checked
JB city centre, Bukit Chagar & Tanjung PuteriSkysuites @ Meldrum HillsServiced residencesFreehold2015About 11Oct 2026
JB city centre, Bukit Chagar & Tanjung PuteriV@SummerPlaceServiced residencesFreehold2016About 10Oct 2026
JB city centre, Bukit Chagar & Tanjung PuteriTriTower Residence (JB Sentral)Serviced residencesFreehold2018 (one list gives 2019)About 8Oct 2026
JB city centre, Bukit Chagar & Tanjung PuteriSky Habitat @ Meldrum HillsServiced apartmentsFreehold2018 (records also show 2019)About 8Oct 2026
JB city centre, Bukit Chagar & Tanjung PuteriTwin Tower Residence (Bukit Chagar)Serviced apartmentsFreehold2023About 3Oct 2026
JB city centre, Bukit Chagar & Tanjung PuteriVeranda Residences, Phase 1Serviced apartmentsFreehold2023 (one site gives 2022)About 3Oct 2026
JB city centre, Bukit Chagar & Tanjung PuteriTrellis ResidencesServiced apartmentsFreeholdDecember 2025Under 1Oct 2026
Stulang, Kolam Ayer & Kampung BahruAloha Tower CondominiumCondominiumFreehold1994About 32Oct 2026
Stulang, Kolam Ayer & Kampung BahruPutri Indah CondominiumCondominiumFreehold1995About 31Oct 2026
Stulang, Kolam Ayer & Kampung BahruPalm Garden CondominiumCondominiumFreehold2007About 19Oct 2026
Larkin, Taman Abad, Bayu Puteri & Kebun TehDatin Halimah CondominiumCondominiumLeasehold1999About 27Oct 2026
Larkin, Taman Abad, Bayu Puteri & Kebun TehAster CourtCondominiumFreehold2000About 26Oct 2026
Larkin, Taman Abad, Bayu Puteri & Kebun TehBayu Puteri 3ApartmentsLeasehold2006About 20Oct 2026
Larkin, Taman Abad, Bayu Puteri & Kebun TehZennith SuitesApartmentsLeasehold2013About 13Oct 2026
Larkin, Taman Abad, Bayu Puteri & Kebun TehScott Towers @ LarkinCondominiumLeasehold2015About 11Oct 2026
Larkin, Taman Abad, Bayu Puteri & Kebun TehEpic ResidenceCondominiumLeasehold2016About 10Oct 2026
Larkin, Taman Abad, Bayu Puteri & Kebun TehVida HeightsServiced residencesLeasehold (to 2097, per a listing)2017About 9Oct 2026
Larkin, Taman Abad, Bayu Puteri & Kebun TehSpace ResidencyServiced residencesFreehold2023About 3Oct 2026
Danga BayTropez ResidencesServiced residencesFreehold2014 (one list gives 2015)About 12Oct 2026
Danga BayStraits View 18Condominium (47 units)Freehold2017About 9Oct 2026
Danga BayBora ResidencesServiced residencesFreehold2019 (one list gives 2017)About 7Oct 2026
Mount Austin, Tebrau, Taman Molek & Austin HeightsTebrau City ResidencesServiced residencesFreehold2009About 17Oct 2026
Mount Austin, Tebrau, Taman Molek & Austin HeightsMolek Pine 2CondominiumFreehold2011About 15Oct 2026
Mount Austin, Tebrau, Taman Molek & Austin HeightsAustin SuitesServiced apartmentsFreehold2014About 12Oct 2026
Mount Austin, Tebrau, Taman Molek & Austin HeightsMidori Green @ Austin HeightsServiced residencesFreehold2016About 10Oct 2026
Mount Austin, Tebrau, Taman Molek & Austin HeightsHavonaServiced residencesFreehold2019About 7Oct 2026
Mount Austin, Tebrau, Taman Molek & Austin HeightsARC @ Austin Hills (Taman Daya)Serviced residencesFreehold2019About 7Oct 2026
Mount Austin, Tebrau, Taman Molek & Austin HeightsThe Peak (Jalan Tebrau)Serviced residencesFreehold2020About 6Oct 2026
Mount Austin, Tebrau, Taman Molek & Austin HeightsD’Lagoon (Taman Seri Austin)Condominium and villasFreehold2021About 5Oct 2026
Skudai, Tampoi, Kempas & PerlingDwi MahkotaCondominiumLeasehold1989About 37Oct 2026
Skudai, Tampoi, Kempas & PerlingMewah View (Taman Bukit Mewah)ApartmentsFreehold1999About 27Oct 2026
Skudai, Tampoi, Kempas & PerlingSri Kenari ApartmentApartmentsLeasehold2004 (sales recorded from 1999)About 22Oct 2026
Skudai, Tampoi, Kempas & PerlingPulai ViewCondominiumLeasehold (to 2102)May 2006About 20Oct 2026
Skudai, Tampoi, Kempas & PerlingJentayu ResidensiServiced apartmentsFreehold2013About 13Oct 2026
Skudai, Tampoi, Kempas & PerlingD’Secret Garden (Kempas Indah)Serviced residencesFreehold2017About 9Oct 2026
Skudai, Tampoi, Kempas & Perling8Scape Residences (Taman Perling)CondominiumFreehold2018About 8Oct 2026
Skudai, Tampoi, Kempas & PerlingThe Garden Residences (Skudai)High-rise residencesLeasehold2021 (earlier blocks may differ)About 5Oct 2026
Skudai, Tampoi, Kempas & PerlingAliff HeightsServiced apartmentsFreehold2024 (handover into 2025)About 2Oct 2026
Kulai (Bandar Putra)Sri Putra ApartmentApartmentsFreehold2005About 21Oct 2026
Kulai (Bandar Putra)D’Putra SuitesServiced apartmentsFreehold2017About 9Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongPan VistaCondominiumFreehold1994About 32Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongPermas VilleCondominiumFreeholdBlock A 2000; Block B 2005About 26 and 21Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongFair ViewCondominiumFreehold2003About 23Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongMidas @ Seri AlamServiced residencesFreehold2011About 15Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongElita @ The Straits ViewCondominiumFreehold2014 (one site gives 2017)About 12Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongThe Marina ViewCondominiumFreehold2016 (one site gives 2017)About 10Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongGreen Haven (Kota Puteri)Serviced residencesFreehold2017About 9Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongCentral ResidencesApartmentsFreehold2023About 3Oct 2026
Permas Jaya, Seri Alam, Kota Puteri & SenibongSummit @ Lagoon Residences (Senibong Cove)High-rise residence (138 units)Check the titleCCC 9 December 2024; keys January 2025About 229 Oct 2026
MediniOne MediniCondominiumLeasehold2015About 11Oct 2026
MediniAfiniti ResidencesServiced residencesLeasehold2016About 10Oct 2026
MediniGrand MediniCondominiumLeasehold2018About 8Oct 2026
MediniElysia Park ResidenceServiced apartmentsLeasehold to 2137CCC 2019About 71 Oct 2026
Puteri HarbourImperiaCondominiumFreehold2015About 11Oct 2026
Puteri HarbourTeega ResidencesCondominiumFreehold2017 (handover from February)About 9Oct 2026
Puteri HarbourSouthern Marina ResidencesServiced apartmentsFreeholdDecember 2018About 81 Oct 2026
Bukit Indah, Nusa Sentral & Nusa BayuThe Sky Executive SuitesServiced residencesFreehold2013About 13Oct 2026
Bukit Indah, Nusa Sentral & Nusa BayuOne Sentral Serviced ResidenceServiced residencesFreeholdNovember 2016About 10Oct 2026
Bukit Indah, Nusa Sentral & Nusa BayuBayu Angkasa (Nusa Bayu)ApartmentsFreehold2017 (records differ)About 9Oct 2026
Bukit Indah, Nusa Sentral & Nusa BayuSky Trees @ Bukit IndahServiced apartmentsFreehold2023About 3Oct 2026
Horizon Hills & East LedangFairway Suites @ Horizon HillsCondominiumFreehold2013About 13Oct 2026
Horizon Hills & East LedangResidensi LedangLow-rise condominiumFreehold2016 (one field gives 2015)About 10Oct 2026
Forest CityNigella ParkServiced residencesFreehold2017 (first handovers there reported September 2018)About 9Oct 2026
Completion years from developer pages, the ministry’s housing records (KPKT) and listing-portal building records, as each project page states them; where sources differ, the other year is shown in brackets. Tenure as recorded on each page; confirm it on the title. Compiled 21 November 2026.

Which Johor Bahru areas have the oldest condos?

The oldest condos on my pages are in Tampoi, Stulang and Kolam Ayer, Permas Jaya and Larkin. Dwi Mahkota in Tampoi was completed in 1989, Aloha Tower and Pan Vista in 1994, Putri Indah in 1995, and Datin Halimah Condominium and Mewah View in 1999 (project pages, October 2026).

These early buildings tend to be low-density blocks with large layouts: Aloha Tower’s units run to about 3,145 sq ft and Putri Indah’s penthouses to about 1,915 sq ft. Permas Jaya has a whole first generation from 1994 to 2005, including Pan Vista, Fair View and both blocks of Permas Ville. For what to check in a building this age, read buying an older condo and see the areas on my Stulang guide, Skudai, Tampoi and Kempas page and Permas Jaya and Senibong page.

Where are the newest completed condos in Johor Bahru?

The newest completed condos on my pages are in the city centre and along the Tampoi and Permas Jaya corridors. Trellis Residences was completed in December 2025, Summit @ Lagoon Residences in Senibong had its CCC on 9 December 2024, and Aliff Heights in Tampoi was completed in 2024, with handover running into 2025.

Bukit Chagar’s Twin Tower Residence, Veranda Residences Phase 1, Space Residency in Taman Abad, Central Residences in Permas Jaya and Sky Trees in Bukit Indah all date from 2023. The city-centre towers matter for Singapore commuters because the RTS Link, targeted for February 2027, runs from Bukit Chagar; see the JB Sentral and Bukit Chagar page. A newer building is not automatically better run, so check its management as well; see checking condo management before buying.

Which JB condos are due to be completed next?

Six towers on my pages show keys due between May 2027 and March 2031. The Coronade Residences in the city centre is due on 7 May 2027 under its sale agreement, and Waterway Peaks in Senibong in October 2027; the furthest out is Skyline One Sentosa, expected in March 2031 (project pages, October 2026).

Building (project page)AreaKeys dueBasisPage checked
The Coronade ResidencesJB city centre7 May 2027Per the SPA, after an approved extension; about 83% built1 Oct 2026
Waterway Peaks @ Senibong CoveSenibong, MasaiOctober 2027Expected completion, developerOct 2026
Ponderosa RegencyTaman Ponderosa8 January 2029Per the SPA, after an approved extension1 Oct 2026
Daya 1 ResidencesTaman Daya3 June 2029Per the SPA, after an approved extension1 Oct 2026
Calia ResidencesDanga Bay26 January 2030Ministry (KPKT) record, after an approved extensionOct 2026
Skyline One SentosaTaman SentosaMarch 2031Expected completion, developer20 Oct 2026
Serviced-apartment and apartment towers under construction on my project pages, with the handover date each page records. Dates can move; your SPA date is the one that binds the developer.

Several of these dates already include an approved extension of time, and the developer’s expected date is not the same as the date in your sale agreement. For a new launch, the legal handover date is the one in your SPA; read late vacant possession and LAD claims and new launch vs subsale, and browse current launches on my new launches in JB page.

Does a condo’s age affect my home loan?

It can, but there is no single Bank Negara rule on building age. Banks look at the valuation, the condition and, for leasehold, the years left on the lease. The maximum home loan tenure is 35 years, a cap Bank Negara set in July 2013, and banks commonly want the loan to end by about age 70 (my older-condo and loan tenure guides, November 2026).

Leasehold is where age bites hardest. Fourteen of the 63 buildings in the table are leasehold, including Dwi Mahkota (1989) and Datin Halimah (1999). Malay Mail reported in July 2026 that owners of older leasehold homes in Petaling Jaya faced shorter repayment periods and narrower margins. Pulai View’s lease runs to 2102, so it has plenty left; check the expiry on the title of any older leasehold unit. See home loan tenure and age limits, margin of financing rules and freehold vs leasehold.

An older building can also value lower than the asking price if it looks tired, which leaves a bigger gap to pay in cash. If that happens, read when the bank valuation is lower than the price.

How does a building’s age change maintenance costs and the sinking fund?

Older buildings need more big repairs. By the time a condo is 20 or more years old, lifts, pumps, pipes, roofs and fire systems come due for replacement, and the owners pay through the service charge, the sinking fund or a special levy. In the table above, 13 buildings were already about 20 years old or more in 2026.

Under the Strata Management Act 2013, owners pay a sinking fund of at least 10% of the service charge, and that fund may be spent only on capital items such as replacing fixtures and upgrading common property (sections 24 and 25). Since 1 June 2024, each lift needs a certificate of fitness valid for 15 months from inspection. In an older building, ask for the audited accounts, the sinking fund balance, the lift certificates and the last two or three years of AGM minutes. My guides on maintenance fees and the sinking fund, special levies for major repairs and condo fire safety and lifts explain each one.

A new building has its own cost: the first years can bring defects, though the 24-month defect liability period from vacant possession covers many of them. For fees building by building, see JB condo maintenance fees by area.

What does the CCC have to do with a building’s age?

The year a building was certified decides which certificate it has. From 12 April 2007, a Certificate of Completion and Compliance (CCC), issued by the project’s architect or engineer, replaced the council’s Certificate of Fitness for Occupation. A building certified before that date has a Certificate of Fitness; one certified after it has a CCC.

That puts the 13 buildings completed in 2006 or earlier in the Certificate of Fitness era. Palm Garden Condominium (2007) could fall on either side, so ask which certificate it holds. For newer buildings, a CCC date is often the most precise completion date: Summit @ Lagoon Residences shows a CCC dated 9 December 2024 on the ministry’s housing record, with keys in January 2025. Under the standard strata sale agreement, the developer can give vacant possession only once the CCC is issued, and the CCC is not the same as the strata title. Read the CCC explained and strata titles in Johor Bahru.

Can foreign buyers buy these older JB condos?

Johor’s minimum price for foreign buyers is RM1 million for residential property, with only limited exceptions (for example, some serviced apartments sold by developers with state approval); no area is exempt as a whole. Many older condos sell below that level: my Putri Indah and Pulai View pages noted asking prices below RM1 million in October 2026.

Every foreign purchase also needs state approval, with a fee of 3% (or JPPH valuation if higher), minimum RM30,000, plus RM2,000 per title (PTG Johor circular (2025), from 1 July 2025). On a RM1.1 million unit with one title, that is RM33,000 plus RM2,000, or RM35,000. Stamp duty on the transfer is a flat 8% for non-citizens from 1 January 2026 (LHDN, 30 June 2026), about RM88,000 on the same unit. See Johor’s minimum price for foreigners, the Johor foreign buyer rules FAQ, state consent in Johor and stamp duty in 2026. If you are moving under MM2H, I coordinate with a MOTAC-licensed MM2H agent and handle the property side; see MM2H property support.

How were these completion years collected?

Every year comes from my own project pages, which record completion from developer pages, the ministry’s housing records and listing-portal building records, and say where these disagree. I read all 309 project pages on 21 November 2026 and kept completed high-rise homes, leaving out landed, commercial and industrial projects.

I also left out pages whose project name carries a developer’s brand, so the table is a sample of 63 buildings, not every condo in JB. Where a page gave two years, the table shows both. A portal year may be the year keys began rather than the CCC date, so for a purchase ask the seller or management for the CCC or Certificate of Fitness and the title. To compare buildings on other points, use how to compare condos in JB and my project directory.

Where to go next

More Johor living guides: All Johor guides · JB property map · Best areas to live in JB · Mount Austin · Medini · Danga Bay · Iskandar Puteri

Looking at an older or newer condo in Johor Bahru?

Send me the building and unit, and I will check its completion year, whether the CCC or Certificate of Fitness and the title are in place, and, through the seller, ask management for the accounts, sinking fund balance and recent AGM minutes. You can also book an appointment for viewings, or a Zoom consultation if you are overseas.

Sources (all pages on this site, read 21 November 2026; completion years as recorded on each page from developer, ministry and listing-portal records): Skysuites @ Meldrum Hills, project page, checked October 2026; V@SummerPlace, project page, checked October 2026; TriTower Residence (JB Sentral), project page, checked October 2026; Sky Habitat @ Meldrum Hills, project page, checked October 2026; Twin Tower Residence (Bukit Chagar), project page, checked October 2026; Veranda Residences, Phase 1, project page, checked October 2026; Trellis Residences, project page, checked October 2026; Aloha Tower Condominium, project page, checked October 2026; Putri Indah Condominium, project page, checked October 2026; Palm Garden Condominium, project page, checked October 2026; Datin Halimah Condominium, project page, checked October 2026; Aster Court, project page, checked October 2026; Bayu Puteri 3, project page, checked October 2026; Zennith Suites, project page, checked October 2026; Scott Towers @ Larkin, project page, checked October 2026; Epic Residence, project page, checked October 2026; Vida Heights, project page, checked October 2026; Space Residency, project page, checked October 2026; Tropez Residences, project page, checked October 2026; Straits View 18, project page, checked October 2026; Bora Residences, project page, checked October 2026; Tebrau City Residences, project page, checked October 2026; Molek Pine 2, project page, checked October 2026; Austin Suites, project page, checked October 2026; Midori Green @ Austin Heights, project page, checked October 2026; Havona, project page, checked October 2026; ARC @ Austin Hills (Taman Daya), project page, checked October 2026; The Peak (Jalan Tebrau), project page, checked October 2026; D’Lagoon (Taman Seri Austin), project page, checked October 2026; Dwi Mahkota, project page, checked October 2026; Mewah View (Taman Bukit Mewah), project page, checked October 2026; Sri Kenari Apartment, project page, checked October 2026; Pulai View, project page, checked October 2026; Jentayu Residensi, project page, checked October 2026; D’Secret Garden (Kempas Indah), project page, checked October 2026; 8Scape Residences (Taman Perling), project page, checked October 2026; The Garden Residences (Skudai), project page, checked October 2026; Aliff Heights, project page, checked October 2026; Sri Putra Apartment, project page, checked October 2026; D’Putra Suites, project page, checked October 2026; Pan Vista, project page, checked October 2026; Permas Ville, project page, checked October 2026; Fair View, project page, checked October 2026; Midas @ Seri Alam, project page, checked October 2026; Elita @ The Straits View, project page, checked October 2026; The Marina View, project page, checked October 2026; Green Haven (Kota Puteri), project page, checked October 2026; Central Residences, project page, checked October 2026; Summit @ Lagoon Residences (Senibong Cove), project page, checked 29 October 2026; One Medini, project page, checked October 2026; Afiniti Residences, project page, checked October 2026; Grand Medini, project page, checked October 2026; Elysia Park Residence, project page, checked 1 October 2026; Imperia, project page, checked October 2026; Teega Residences, project page, checked October 2026; Southern Marina Residences, project page, checked 1 October 2026; The Sky Executive Suites, project page, checked October 2026; One Sentral Serviced Residence, project page, checked October 2026; Bayu Angkasa (Nusa Bayu), project page, checked October 2026; Sky Trees @ Bukit Indah, project page, checked October 2026; Fairway Suites @ Horizon Hills, project page, checked October 2026; Residensi Ledang, project page, checked October 2026; Nigella Park, project page, checked October 2026; The Coronade Residences, project page, checked 1 October 2026; Waterway Peaks @ Senibong Cove, project page, checked October 2026; Ponderosa Regency, project page, checked 1 October 2026; Daya 1 Residences, project page, checked 1 October 2026; Calia Residences, project page, checked October 2026; Skyline One Sentosa, project page, checked 20 October 2026; Buying an older condo, checked 13 November 2026 (citing the Strata Management Act 2013, sections 24 and 25, and the 2024 lift certificate-of-fitness rules); The CCC explained, checked 9 November 2026 (citing the Street, Drainage and Building Act 1974, section 70, and the Housing Development Regulations 1989, Schedule H); Home loan tenure and age limits, checked 12 November 2026 (citing Bank Negara Malaysia, July 2013, and Malay Mail, 22 July 2026); Johor foreign buyer rules FAQ, checked 19 November 2026 (citing PTG Johor circular (2025) and LHDN, 30 June 2026)

Jason Lim, REN 84424, IQI Realty Sdn. Bhd. E (1) 1584/6. General information checked on 21 November 2026; not legal, tax, valuation or financial advice. Completion years are as recorded on the project pages above, from developer, ministry and listing-portal records; they are not certificates. Ask for the CCC or Certificate of Fitness and the title of the exact unit, and confirm loan terms with your bank and costs and approvals with your lawyer.