Jason Lim · Johor Bahru property advisor

When Do You Need an Architect or Engineer for a Renovation in Malaysia? (Johor Guide 2026)

中文 · Bahasa Melayu · Bahasa Indonesia

By Jason Lim, REN 84424 · IQI Realty · Checked on 15 November 2026

This guide is for owners and buyers in Johor Bahru, including buyers from Singapore, Indonesia, India and China and MM2H participants, who plan to renovate. The short answer: painting, tiling and kitchen cabinets need no architect or engineer, but any work that needs council plans (an extension, new roof, loft or upper floor) must be signed by a registered professional, and anything touching the structure needs a registered engineer. For houses of up to two storeys and 300 m², a registered building draughtsman can sign instead of an architect.

Quick answer

  • The trigger is the permit: if the council needs plans, section 70 of the Street, Drainage and Building Act 1974 requires a submitting person to prepare and certify them.
  • Who can sign: a registered architect, a Professional Engineer with Practising Certificate (PEPC) or a registered building draughtsman.
  • Draughtsman limit: up to two storeys and 300 m² of total floor area, in the council area of registration (Architects Act 1967, section 24).
  • Structure means an engineer: cutting load-bearing walls or adding a concrete slab, roof or floor needs a PEPC’s design.
  • Interior designers and contractors cannot sign building plans.
  • Fees: architects have a legal minimum scale (10% of the cost of renovation works up to RM500,000, 2010 rules); the engineers’ 1998 scale was under review in June 2026.

Who is who in a renovation

Each title belongs to a register, and only some registers let a person sign plans for the council.

ProfessionalRegistered withCan sign building plans?Usual role
ArchitectLembaga Arkitek Malaysia (LAM, Board of Architects)Yes, any sizeDesign, permit drawings, submission, supervision
PEPC, usually civil or structuralBoard of Engineers Malaysia (BEM)Yes, in the engineering branch on the registerStructural design: beams, slabs, foundations, retaining walls
Registered building draughtsman (pelukis pelan bangunan berdaftar)LAMYes, up to two storeys and 300 m²Plans for small house extensions and alterations
Interior designerLAM (Part VA, Architects Act)NoLayout, finishes, joinery, lighting
ContractorCIDBNoBuilds the work
Sources: Architects Act 1967, sections 8, 24 and 27A; Registration of Engineers Act 1967, section 8; Uniform Building By-Laws 1984, by-law 2; CIDB, March 2024. Checked November 2026. Not legal advice.

What the law says

  • Street, Drainage and Building Act 1974 (Act 133). Section 70(1) bars erecting a building without the council’s prior written permission. Under section 70(16), altering a house with new foundations, a new or bigger superstructure or roof, or rebuilt outer or party walls counts as erecting. Section 70(19) requires plans to be prepared and certified by a principal submitting person or submitting person.
  • Uniform Building By-Laws 1984 (UBBL). By-law 2 calls an architect, registered building draughtsman or engineer a “qualified person”. By-law 3 says plans must be submitted by one, by-law 5 makes them supervise the work, and by-law 18 lets councils accept sketch plans for minor works.
  • The professional Acts. Section 8(1) of the Architects Act 1967 reserves submitting architectural plans to registered architects; section 24(5) sets the draughtsman’s limit. Section 8(1) of the Registration of Engineers Act 1967 lets only a PEPC or a registered engineering consultancy practice submit engineering plans; breaching it carries a fine of up to RM50,000, up to three years’ jail, or both (section 24).

Section 70(17) of Act 133 also presumes, until proved otherwise, that building work was done by the landowner. If a contractor builds without plans, the council looks to you. For permit types and council fees, see my renovation permit guide for Johor Bahru.

Which renovations need which professional

Councils publish no single list. This table combines Act 133, the UBBL and Majlis Bandaraya Johor Bahru’s (MBJB) minor works guideline. Confirm with your council (MBJB, MBIP, MBPG or MPKu) first.

Type of workCouncil approval?Who you usually need
Painting, floor tiles, kitchen cabinets, wardrobes, air-conditionersNot on the councils’ permit listsNo architect or engineer; a CIDB-registered contractor
Awning over the porch or yardAwning permit (MBJB online; form with sketch plan at MBIP)Council standard sketch or a simple certified plan
Fence, gate, small addition within MBJB’s standard sketch plansMinor works permitSubmitting person signs; owner applies
New partitions, facade changesMinor works permitSubmitting person; an engineer if a wall carries load
Removing or cutting a load-bearing wall, beam or columnYes (alteration permit or plans)PEPC for the structure, with an architect or draughtsman for the plans
Concrete flat roof, new slab or loft slab, extra floorFull plan submissionArchitect, or a draughtsman within the limit, plus a PEPC
Demolishing over 60% of the house and rebuildingNew building planPrincipal submitting person through to a new CCC
Retaining wall or work on a slopeYes, often with earthworks plansPEPC (civil or geotechnical)
Sources: Act 133, section 70; UBBL, by-laws 2, 3 and 18; MBJB minor works guideline (updated 2016) and checklist MBJB/OSC/UT/P2_14 (December 2022); MBIP awning form. Accessed November 2026. Not legal advice.

Small houses: when a draughtsman is enough

Most JB terrace and semi-detached houses are one or two storeys, so a registered building draughtsman can often prepare and submit the plans. Section 24 of the Architects Act limits them to buildings of no more than two storeys and 300 m² of total built-up floor area, submitted only to the council their registration covers. Anything bigger needs an architect, and structural work still needs a PEPC.

When the structure is involved, bring in an engineer

You cannot tell by looking whether a wall carries load. Before hacking a wall, opening up a kitchen, adding a concrete roof over the yard or putting a water tank or heavy equipment on a slab, ask a PEPC to check. BEM’s practice FAQ (May 2023) says only a PEPC practising through a registered engineering consultancy practice can act as a submitting person and sign Form Gs. If earlier works left cracks, see what cracks in walls mean; for shared walls, the party wall guide.

Condos: management first, professionals when needed

The standard by-laws in the Strata Management (Maintenance and Management) Regulations 2015 require the management’s prior written approval for any renovation. Paragraph 28 adds that both the authority and the management must approve platforms, moved external doors or windows, shifted plumbing and whole-unit rewiring, and bars hacking shear walls beyond permitted limits. For these, expect to provide drawings from a qualified person and, near the structure, an engineer’s letter. See my condo renovation rules guide.

Buying a house you plan to extend?

Send me the address or listing and what you want to build. I’ll ask the seller for the approved plans and permits, and point out what your architect or engineer should look at before you offer.

WhatsApp Jason

The paperwork trail: Form B, Form Gs and the CCC

For permit work, your qualified person’s duties run until the work is finished:

  1. Plans approved. The submitting person signs the plans with you as owner and submits them through the council’s One Stop Centre (OSC 3.0 Plus).
  2. Form B. Notice to the council of the intention to start or resume work, under section 70(9) of the Act (UBBL by-law 22).
  3. Form C. The qualified person confirms the setting out matches the approved site plan (by-law 23).
  4. Supervision. By-law 5 requires the qualified person, or someone they authorise, to supervise. Budget for site visits.
  5. Forms G1 to G21. Under full building plans, each stage, from foundations to water and electricity, gets a stage certificate.
  6. Form F, the CCC. The principal submitting person issues the Certificate of Completion and Compliance (Perakuan Siap dan Pematuhan) and deposits a copy with the council, as KPKT’s OSC manual describes.

Minor works under a sketch-plan permit usually end with the permit, not a CCC. If your qualified person withdraws, by-law 7 says work may not continue until you appoint a replacement. My CCC guide has more.

How architects and engineers charge

ScaleStatusWhat it says
Architects (Scale of Minimum Fees) Rules 2010, P.U. (A) 53/2010In operation since 1 March 2010; the version LAM publishesA minimum percentage of the cost of works. Individually designed houses and renovation works (Category 1): 10% for works of RM500,000 or less. Housing estates and shop houses (Category 2): 7.5%. Higher fees need the client’s prior agreement.
Engineers’ scale of feesGazetted 1998; a revision was with the Attorney General’s Chambers in June 2026The Deputy Works Minister said the revision would replace maximum fees with a minimum benchmark, binding once gazetted.
Sources: LAM, Architects (Scale of Minimum Fees) Rules 2010, rules 3 and 23; Malay Mail (Bernama), 29 June 2026. Checked November 2026.

Illustration only: on a RM200,000 Category 1 renovation, 10% means a minimum of RM20,000 for the full basic services in the rules. A draughtsman or a narrower scope may be priced differently, so ask for a written fee proposal covering design, drawings, submission, site visits, stage certificates and the CCC. Council fees are extra; at MBJB, minor works plan processing starts at RM7 per m² on the ground floor, minimum RM70 (December 2022 checklist). For budgets, see renovation and furnishing costs in JB and renovation financing options.

How to check and appoint the right person

  • Ask for the registration number and check it with LAM (architects, draughtsmen) or BEM (engineers). For an engineer, confirm the practising certificate is current; BEM certificates expire on 31 December each year.
  • Match the scope to the registration. A draughtsman for a three-storey house is outside what the law allows.
  • Get an appointment letter stating scope, fees, payment stages, site visits and who applies and pays for each permit.
  • Avoid signatures for hire. If someone offers to have plans “chopped” by a professional who will never visit the site, walk away; the signer must supervise.
  • Check the builder separately on CIDB’s search. See hiring an interior designer or contractor in JB and renovation contractor disputes.

Unsure whether you need a professional at all? Ask the council: MBIP has said its building unit advises owners on approved standards at no fee (The Star, October 2021). MBJB asks for a neighbour’s certificate (perakuan jiran) where structures are shared. I do not recommend any architect, engineer or firm over another.

Buying a house that was already renovated

Many JB subsale houses have back kitchens, extra rooms or concrete roofs added years ago. Before you offer, ask for the approved plans and permits for each addition, the name of the professional who signed them and, for full-plan works, the CCC. If the seller cannot find them, see getting a copy of approved building plans in Johor. Unapproved works can lower a bank valuation and pass the risk to you; see illegal extensions in subsale houses and the subsale inspection checklist.

Foreign owners and owners abroad

The rules are the same for foreign owners, and because of the landowner presumption, you answer for what is built while you are away. A local architect or engineer who deals with the council and supervises the site is often the practical choice; see managing JB property from overseas. If you are still buying, Johor’s RM1 million minimum for foreign buyers applies, with only limited exceptions (for example, some serviced apartments sold by developers with state approval); no area is exempt as a whole. For MM2H, I coordinate with a MOTAC-licensed MM2H agent; approval rests with the authorities.

Where to buy if this matters to you

Compare them on my JB property map, or see buying land to build a house in Johor.

More Johor living guides: Renovation permits in JB · Renovations and resale value · Landed house types in Malaysia · Hillside and slope homes in JB · Buying a pre-war shophouse

Frequently asked questions

Do I need an architect to renovate my house in Malaysia?

Not for painting, tiling or cabinets. If the council needs plans, for example for an extension, new roof, loft or extra floor, they must be signed by an architect, a registered building draughtsman or a Professional Engineer with Practising Certificate.

Can a building draughtsman sign renovation plans instead of an architect?

Yes, for buildings of no more than two storeys and 300 square metres of total built-up floor area, and only in the council area the draughtsman is registered for, under section 24 of the Architects Act 1967. Larger buildings need an architect.

When do I need a structural engineer for a renovation?

When the work touches the structure: cutting load-bearing walls, beams or columns, adding a concrete roof, slab or floor, retaining walls or heavy loads on a slab. The design must come from a Professional Engineer with Practising Certificate registered with the Board of Engineers Malaysia.

Can an interior designer or contractor submit plans to the council?

No. Interior designers register with the Board of Architects and contractors with CIDB, but neither may sign building plans. Permit work needs an architect, registered building draughtsman or engineer.

How much does an architect charge for a house renovation in Malaysia?

The Architects (Scale of Minimum Fees) Rules 2010 set a minimum of 10% of the cost of renovation works of RM500,000 or less for full basic services. Narrower services or a draughtsman may cost differently, so ask for a written fee proposal.

Who issues the CCC after a renovation?

For works under full building plans, the principal submitting person (the architect or engineer) issues the Certificate of Completion and Compliance on Form F after the stage certificates. Minor works under a sketch-plan permit usually end with the permit.

Planning a renovation or buying a renovated house in JB?

Tell me the property and what you want to change. I will ask the seller for the approved plans and permit history where possible, flag extensions that look unapproved and suggest questions for your architect, engineer and lawyer. You can also book an appointment for a viewing, or a Zoom consultation if you are abroad.

Sources: Street, Drainage and Building Act 1974, Part V, section 70 (as published by the National House Buyers Association), checked November 2026; Uniform Building By-Laws 1984, by-laws 2, 3, 5, 7, 18, 22 and 23 (text published by JKR), checked November 2026; Lembaga Arkitek Malaysia, Architects Act 1967 incorporating amendments up to February 2015 (sections 8, 24 and Part VA), checked November 2026; Lembaga Arkitek Malaysia, Architects (Scale of Minimum Fees) Rules 2010, P.U. (A) 53/2010, checked November 2026; Board of Engineers Malaysia, Registration of Engineers Act 1967 as amended by Act A1479 (in force 31 July 2015), sections 7, 8 and 24, checked November 2026; Board of Engineers Malaysia, professional practice FAQ, May 2023; Board of Engineers Malaysia, circulars and guidelines (Circular No. 007 on PEPC endorsement of the CCC and Form Gs; Circular No. 009 on submission of building plans by PEPCs and architects), checked November 2026; Board of Engineers Malaysia, registration information (PEPC and engineering consultancy practices), checked November 2026; Malay Mail (Bernama), “Ahmad Maslan says government finalising Engineers Scale of Fees review”, 29 June 2026; MBJB, Kerja-Kerja Kecil Rumah Kediaman (minor works guideline for houses), updated 2016, accessed November 2026; MBJB, checklist for minor renovation permit plans (MBJB/OSC/UT/P2_14), December 2022, accessed November 2026; MBIP, awning permit application form, accessed November 2026; KPKT, OSC 3.0 Plus manual (Form G and Form F), as published by MBJB, checked November 2026; Strata Management (Maintenance and Management) Regulations 2015, P.U. (A) 107/2015 (copy published by DBKL), checked November 2026; CIDB, “Avoid high fines: contractors are reminded to register and renew”, 20 March 2024; The Star, “MBIP: Seek approval before carrying out renovations”, 21 October 2021

Jason Lim, REN 84424, IQI Realty Sdn. Bhd. E (1) 1584/6. General information checked on 15 November 2026, not legal or engineering advice. Rules, fee scales and council requirements change; confirm with your council (MBJB, MBIP, MBPG or MPKu), the Board of Architects, the Board of Engineers and a registered professional before you build or buy.