Jason Lim · Johor Bahru property advisor

10 years in Malaysian property · Johor Bahru & Kuala Lumpur · Jason Lim, REN 84424 · 中文版 · Bahasa Melayu
Home › Johor Bahru projects › Iskandar Puteri › Aspira Hills

Gerbang Nusajaya, Iskandar Puteri · Under construction

Aspira Hills

UEM Sunrise’s freehold, individual-title estate of double-storey terraces in Gerbang Nusajaya, released in seven phases since 2024: about 900 homes of 1,673–2,146 sq ft, with later phases at RM1.05m–1.50m on the advertising permits. Sold to Malaysians only.

FreeholdIndividual title2-storey terracesGuardedMalaysians only

Replies on WhatsApp from Jason himself · No obligation

901homes in seven phases (KPKT)
Oct 2026Phase 1 keys due (KPKT)
6 acrescommunity park

Jason’s take

A freehold terrace on its own title near the Gerbang Nusajaya interchange, for Malaysian families, from RM680,000 on the permit. Phase 1 is almost built, and KPKT lists one phase as behind schedule. Ask which phase your unit is in and check the keys date in the SPA. It’s not open to foreign buyers.

Jason Lim · REN 84424 · IQI Realty Sdn. Bhd. E (1) 1584/6

Answer block

Aspira Hills at a glance

Every figure here comes from the developer, the government housing register or the property records named at the foot of the page. Where sources disagree, the range is shown. Where nobody has published a number, it is not on this page.

Development

Aspira Hills, Gerbang Nusajaya

Developer company Nusajaya Rise Sdn Bhd, a UEM Sunrise subsidiary; developer licence 14228/02-2029/1559(A). No separate registered (Taman) name was shown

Address

Jalan Sentral 2, Gerbang Nusajaya

Iskandar Puteri, by the Gerbang Nusajaya interchange of the Second Link Expressway

Tenure

Freehold, individual title

UEM Sunrise permit page and project pages, Oct 2026

Homes

901 terraces

Phase 1A 142, 1B 121, 1C 190, 2A 192, 3A 132, 3B 77, 4 47 (UEM Sunrise permit page)

Advertising permits

Seven permits, one per phase

Phases 1A–1C renewed to Aug 2027 (14228-10, -9, -11); Phases 2A and 3A valid to 23 Jun 2027 (14228-14, -13); Phases 3B and 4 valid to 27 Oct 2027 (14228-15, -16), per KPKT TEDUH

Permit price band

RM680,000 – RM1,495,000

Phases 1A–1C RM680,000–1,260,000; Phases 2A–4 RM1,046,250–1,495,000

Keys due

13 Oct 2026 (Phase 1) to 26 Dec 2027

KPKT record: Phase 1 about 95–97% built; Phase 2A 27 Jul 2027, 3A 30 Jul 2027, 3B 20 Dec 2027, 4 26 Dec 2027. KPKT flags Phase 1A as behind schedule (“sakit”)

Foreign buyers

Not available

The developer states the project is not for sale to non-Malaysian citizens, and the land carries a restriction in interest

Why this address

Four things buyers weigh at Aspira Hills

A large, phased terrace estate close to the Second Link. Here is the case, and the catch.

🛣️

By the Second Link interchange

The estate sits off the Gerbang Nusajaya interchange, with a direct road to the Tuas checkpoint, according to UEM Sunrise.

📜

Individual titles

Each terrace is freehold with its own title rather than a strata title, which the developer highlights for this project.

🌳

Park-based layout

A 6-acre community park, eight pocket gardens and a jogging track are planned inside a guarded neighbourhood.

⚖️

What to weigh: Malaysians only, and supply

Foreigners cannot buy here. Phases 2A to 4 are due between April and August 2027, and neighbouring Aspira ParkHomes, Senadi Hills and KSL’s Riveria Garden are adding similar terraces, so resale and rental competition will be real.

The development

Aspira Hills, decoded

Double-storey, individual-title terraces in UEM Sunrise’s Gerbang Nusajaya township, released phase by phase since 2024.

901Homes
7Phases
6Acre park
8Pocket gardens

Facilities

As listed by UEM Sunrise (Oct 2026) and PropertyGuru’s project page (Oct 2026).

Outdoors

Parks and play

  • 6-acre community park
  • 8 pocket gardens
  • Jogging track
  • Playground
  • Football field
  • Basketball court

Security

Living

  • Guarded neighbourhood
  • Guard patrols
  • Perimeter fencing

Where the project is now

Aug 2024Phases 1A–1C permits issued (453 homes)
Jun 2025Phases 2A and 3A permits issued (324 homes)
Oct 2025Phases 3B and 4 permits issued (124 homes)
Oct 2026Phase 1 keys due; about 95–97% built (KPKT)
Jul 2027Phases 2A and 3A keys due (KPKT)
Dec 2027Phases 3B and 4 keys due (KPKT)
Ask me what the brochure doesn’t tell you

Layouts

All 3 Aspira Hills layouts

Three of the Phase 3B and 4 layouts from UEM Sunrise’s project pages, October 2026. Earlier phases run from about 1,673 sq ft. Bathroom counts are the developer’s “up to” figures. Tap any layout and the drawing comes to your WhatsApp.

Type A intermediate (20 × 70 ft) — 1,743 sq ft

4 bed · 1,743 sq ft · lot 20 × 70 ft

4 Bed3 Bath
Get this floor plan

Type A end/corner (22 × 70 ft) — 1,987 sq ft

4 bed · 1,987 sq ft · lot 22 × 70 ft

4 Bed3 Bath
Get this floor plan

Type B end/corner (22 × 70 ft) — 2,146 sq ft

4 bed · 2,146 sq ft · lot 22 × 70 ft

4 Bed4 Bath
Get this floor plan

Location & connectivity

Where Aspira Hills sits

Jalan Sentral 2, Gerbang Nusajaya, 79200 Iskandar Puteri, Johor.

Open in Google Maps →
Before you book. Each phase has its own permit, price band and keys date, and KPKT lists Phase 1A as behind schedule. Ask which phase the unit is in, check the SPA price against that phase’s permit band, and confirm the vacant possession date in the SPA.
Senibong Golf Club2.5 kmUEM Sunrise
Gelang Patah town4.4 kmUEM Sunrise
EduCity6.0 kmUEM Sunrise
Legoland Malaysia8.2 kmUEM Sunrise
Gleneagles Hospital Medini8.3 kmUEM Sunrise

The government record

The registered name is Gerbang Nusajaya

This is what the Ministry of Housing records from the developer’s statutory returns: the price band on the advertising permit and the certified construction progress. A brochure price can be revised; the permit price was filed.

Project codeRegistered nameUnitsPrice band on the permitBuiltKeys due
14228-10Phase 1A (behind schedule)142RM680,000 – RM1,030,00097%
13 Oct 2026
14228-9Phase 1B121RM710,000 – RM990,00097%
13 Oct 2026
14228-11Phase 1C190RM740,000 – RM1,260,00095%
13 Oct 2026
14228-14Phase 2A192RM1,046,250 – RM1,312,50070%
27 Jul 2027
14228-13Phase 3A132RM1,046,250 – RM1,426,25036%
30 Jul 2027
14228-15Phase 3B77RM1,087,500 – RM1,495,00035%
20 Dec 2027
14228-16Phase 447RM1,106,250 – RM1,448,75026%
26 Dec 2027

Read from teduh.kpkt.gov.my on 9 October 2026. Filed advertisement (PDF): 14228-10 · 14228-9 · 14228-11 · 14228-14 · 14228-13 · 14228-15 · 14228-16.

The recorded numbers

The price numbers

Recorded sales and asking prices are different things. Transacted figures come from deals recorded with the government valuation department; asking figures are what owners or the developer are listing at.

MeasureFigureSource and date
Price on the permit
Phase 1A (142 homes)
RM680,000 – RM1,030,000KPKT TEDUH and UEM Sunrise, Oct 2026
Price on the permit
Phase 1B (121 homes)
RM710,000 – RM990,000KPKT TEDUH and UEM Sunrise, Oct 2026
Price on the permit
Phase 1C (190 homes)
RM740,000 – RM1,260,000KPKT TEDUH and UEM Sunrise, Oct 2026
Price on the permit
Phase 2A (192 homes)
RM1,046,250 – RM1,312,500KPKT TEDUH and UEM Sunrise, Oct 2026
Price on the permit
Phase 3A (132 homes)
RM1,046,250 – RM1,426,250KPKT TEDUH and UEM Sunrise, Oct 2026
Price on the permit
Phase 3B (77 homes)
RM1,087,500 – RM1,495,000KPKT TEDUH and UEM Sunrise, Oct 2026
Price on the permit
Phase 4 (47 homes)
RM1,106,250 – RM1,448,750KPKT TEDUH and UEM Sunrise, Oct 2026

These are the price bands on each phase’s advertising and sales permit as published by UEM Sunrise, checked October 2026. They are not transactions. No transacted, asking or rent records were found for the project yet.

Track record

About Nusajaya Rise Sdn Bhd (UEM Sunrise)

UEM Sunrise Berhad is the master developer of Iskandar Puteri, formerly Nusajaya, and Aspira Hills is part of its Gerbang Nusajaya township.

The developing company named on the permits is its subsidiary Nusajaya Rise Sdn Bhd, which also holds the permits for Aspira LakeHomes.

Straight answers

Frequently asked questions

What homes are there and what sizes?

All 901 homes are double-storey terraces with up to four bedrooms, from about 1,673 to 2,146 sq ft on lots of 20 × 65 ft to 22 × 70 ft, spread over seven phases.

When will Aspira Hills be completed?

The developer gives July 2026 for Phases 1A to 1C, April 2027 for Phases 2A and 3A, and August 2027 for Phases 3B and 4. Confirm the date in your SPA.

Is it freehold, and who is the developer?

Yes, freehold with individual titles. The developing company is Nusajaya Rise Sdn Bhd, part of UEM Sunrise.

Can foreigners buy at Aspira Hills?

In Johor a foreign buyer generally needs to pay at least RM1 million for a residential property, with state consent. Since 1 July 2025 Johor charges foreign buyers a consent levy of 3% of the price or RM30,000, whichever is higher, and stamp duty on transfers to foreigners is a flat 8% from 1 January 2026. Bumiputera lots, low-cost and affordable units, Malay Reserve land and single or one-and-a-half-storey terraces are closed to foreigners. Here the developer states the project is not available to non-Malaysian citizens, and the land carries a restriction in interest against transfer to non-citizens without state approval, so foreigners should look elsewhere.

Berapa harga rumah di Aspira Hills?

Julat harga dalam permit iklan ialah RM680,000 hingga RM1,260,000 untuk Fasa 1A–1C dan RM1,046,250 hingga RM1,495,000 untuk Fasa 2A hingga 4. Semua rumah teres dua tingkat, pegangan bebas dengan hakmilik individu.

Aspira Hills 价格多少?什么时候完工?

广告准证价格:第1A至1C期约RM68万至RM126万,第2A至4期约RM105万至RM150万。永久地契独立地契双层排屋,后期预计2027年4月至8月完工,只限马来西亚公民购买。

Get the current price list and units available at Aspira Hills

Prices move and the better units go first. Tell me your budget and whether you are buying to live in or to rent out, and I will send back the units that fit, not a generic brochure.

Buying, selling or renting: one conversation, no obligation.

JL

Jason Lim

10 years in Malaysian property · Johor Bahru & Kuala Lumpur · REN 84424 · IQI Realty Sdn. Bhd. E (1) 1584/6

I work with local families, investors and buyers from Singapore and overseas. If a project is not right for what you need, I will say so; that is usually worth more than the brochure.

Message Jason

Last checked October 2026 against the sources listed. Sources: UEM Sunrise permits and licences page, Aspira Hills project pages and blog (Oct 2026); PropertyGuru project page (Oct 2026); KPKT TEDUH (Oct 2026). Unit availability, prices and completion dates are set by the developer or owner and can change. This page is general information, not an offer, valuation or legal advice.

Explore related topics

Aspira HillsFreehold · Individual title · RM1.05m–1.50m on later permits
WhatsApp