By Jason Lim, REN 84424 · IQI Realty · Checked on 16 November 2026
Johor’s main coastal reclamation projects sit along the Straits of Johor: the four planned islands at Forest City near Gelang Patah, the Danga Bay waterfront, the islands beside the Causeway and newer works in the Tebrau Strait off Masai. Each needs state land approval and a Department of Environment (DOE) assessment. Buyers should check the title, tenure, approvals and ground conditions.
Quick answer
- Where: mainly the Straits of Johor, from Forest City through Danga Bay and the Causeway to the Tebrau Strait.
- Who approves: the state government (the seabed is state land), after the DOE approves an environmental impact assessment (EIA).
- EIA rules: reclamation of 50 hectares or more, near sensitive areas or for a man-made island gets the stricter review with public display (EIA Order 2015).
- Title: tenure depends on what the state granted when it alienated the land. Check the actual title.
- Foreigners: normal Johor rules apply: RM1 million minimum for residential property, with only limited exceptions (for example, some serviced apartments sold by developers with state approval); no area is exempt as a whole.
General information, not legal, engineering or financial advice.
What is coastal reclamation, and why has Johor done so much of it?
Coastal reclamation creates new land by filling shallow sea, mudflats or river mouths with sand, then protecting the edge with a seawall. In Johor it has mostly created waterfront sites close to Singapore. A 2010 legal paper from the International Islamic University Malaysia (IIUM) lists the usual issues: environmental damage, ground instability, long-term settlement and disputes between neighbouring states.
Where are Johor’s main reclamation projects?
Areas below are as reported at the time; plans change, so check the current position.
| Area | Location | What was reported | Main use |
|---|---|---|---|
| Forest City | Western Straits of Johor, off Gelang Patah and Tanjung Kupang (Iskandar Puteri) | Four man-made islands, scaled down to about 1,368 hectares (Malay Mail, March 2015); first island partly built and occupied | Mixed: condos, hotel, offices |
| Danga Bay | Mouth of the Skudai River, west of JB city | About 57 acres (about 23 hectares) of existing and reclaimed waterfront at one mixed-use site, on the former Lido Beach area (FOCUS on Geography, 2024) | Condos, waterfront commercial |
| Causeway waterfront | Tanjung Puteri, either side of the Johor–Singapore Causeway | A project of two man-made islands straddling the Causeway; work paused briefly in early 2015 amid environmental concerns (Malay Mail, March 2015), later resumed, and the homes are now completed and occupied | Condos, commercial |
| Tebrau Strait off Masai | Senibong area, east of JB | About 67 hectares of reclamation planned as four small islands, developed in phases from 2026 to 2029 (Bernama, September 2025) | Serviced apartments, terrace houses, hotel, ferry terminal |
| Off Muar | West coast, Muar district | Proposal for three islands covering about 1,295 hectares; EIA on public display February–March 2022 (Malaysiakini, March 2022) | Industrial: energy, port and shipbuilding, not housing |
Not every waterfront project in Johor is on reclaimed land, and some sites mix original and reclaimed ground. If it matters to you, ask for the land’s history and check the title, not the brochure.
Who approves a reclamation project in Johor?
A project should be able to show each of these approvals.
| Approval | Who decides | What it covers |
|---|---|---|
| Use of the seabed and alienation of the new land | Johor State Authority (state executive council), through PTG Johor and the district land office | The National Land Code counts the foreshore and seabed within state waters as state land. New land becomes private only when the state alienates it and issues a title. |
| Development plan | Johor state planning authorities (PLANMalaysia@Johor) and the local council | Large schemes may need a change to the Johor Structure Plan; the Muar proposal needed an addendum to the draft plan for 2030 (Malaysiakini, March 2022). |
| Environmental impact assessment | Department of Environment (DOE) | Required before work starts under the Environmental Quality Act 1974 and the EIA Order 2015. |
| Planning permission and building plans | The local council, such as MBIP for Iskandar Puteri or MBJB for Johor Bahru | Layout and building approvals, and later the Certificate of Completion and Compliance (CCC). |
| Developer’s licence and advertising permit | KPKT (Ministry of Local Government Development) | Needed before a housing developer sells units. |
What does the EIA Order 2015 say about reclamation?
The Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015 was gazetted on 28 August 2015. It puts coastal reclamation in two tiers:
- First Schedule: coastal or riverbank reclamation of less than 50 hectares. Public display and comment are not required unless the DOE Director General asks for them.
- Second Schedule: reclamation of 50 hectares or more, reclamation within or near environmentally sensitive areas (of any size), and any reclamation for a man-made island. These go through the fuller process, with the report put on public display for comments.
When a Second Schedule report is on display, anyone can read the findings on currents, flooding and fisheries and send comments to the DOE.
What environmental and community issues have come up?
Forest City is the best-documented case, so it shows the kinds of questions that can arise on any large reclamation:
- Approval timing. Mongabay reported in September 2018 that work began before an approved EIA was in place, and that the DOE issued a stop-work order in June 2014. The DOE approved the detailed EIA in January 2015 (The Star, 14 January 2015), with 81 environmental directives according to Mongabay.
- Seagrass, shellfish and mangroves. The site covered seagrass and shellfish beds in the western Straits, near the Sungai Pulai mangroves, a Ramsar wetland since 2003 (Mongabay, September 2018).
- Fishing communities. Mongabay reported compensation to about 250 fishermen; the 2022 Muar EIA counted 935 fishermen in its area (Malaysiakini, March 2022).
- Cross-border concerns. In March 2015 Malay Mail reported that work on two Straits projects had paused after Putrajaya and Singapore raised environmental concerns, and that Forest City work restarted once the DOE approved its detailed EIA and environmental management plan.
None of this makes a completed home on reclaimed land a bad buy, but you should know which approvals the project had and whether conditions or disputes remain.
Looking at a waterfront home in Johor?
Send me the project or address. I’ll tell you what I can find on its title type, tenure and approvals, and what to ask your lawyer before you pay a deposit.
WhatsApp JasonWhat title and tenure do homes on reclaimed land have?
Reclaimed land starts as state land and can be owned, charged and sold only after the state alienates it and a title is registered. The state sets the terms, including tenure and land use. The IIUM paper examined whether reclaimed land can be alienated in perpetuity or only on leases of up to 99 years.
In March 2017 politicians publicly disagreed over whether Forest City units were freehold or 99-year leasehold (Malaysiakini, 15 March 2017). For any unit, the registered title is the answer.
- Tenure. Freehold or leasehold, and if leasehold, the expiry year. See my guide to freehold vs leasehold in Malaysia.
- Title stage. On newer reclaimed land the master title may have been issued only recently, and individual strata titles can follow years later. Until then you buy through a deed of assignment; see buying while strata title is pending and qualified vs final title.
- Category and conditions. Residential, commercial or mixed use. Some waterfront serviced apartments sit on commercial titles, which changes quit rent, assessment and utility tariffs. My guide to serviced apartment commercial title costs explains the effect.
- Encumbrances. Charges, caveats or restrictions in interest. Your lawyer’s land title search shows them.
Is it safe to live on reclaimed land in Johor?
Tall buildings on reclaimed land usually rest on deep piles designed for the ground. Roads, car parks and drains around them can keep settling for years as the fill and soft seabed compact.
On a viewing, check:
- Ground around the building. Gaps at the paving, sunken walkways or uneven car parks. My guide to cracks in walls explains which cracks need an engineer.
- Drainage and tides. Ask how the area coped when heavy rain met a high tide; see flood risk in Johor Bahru.
- Salt air. Metal fittings and aircon units wear faster near the sea, which shows in maintenance spending; see waterfront and sea-view homes.
- Seawall upkeep. Ask who maintains it and whether repairs have been needed.
- Works nearby. More reclamation next door means years of dust and lorries. Check the local plan and zoning for neighbouring plots.
If unsure, ask a professional engineer registered with the Board of Engineers Malaysia (BEM) to inspect.
What should buyers check before buying on reclaimed land?
- Confirm the land history. Ask whether the plot is reclaimed and when it was filled.
- Read the title. Tenure, expiry, land use, conditions and whether strata titles exist yet.
- Check the developer and permits. For a new launch, check the KPKT developer licence and advertising permit; see how to check a developer.
- Ask about the EIA. When was it approved, and with what conditions?
- Confirm the CCC. For a completed building, make sure a Certificate of Completion and Compliance was issued.
- Read the management accounts. Look at seawall, corrosion and pump repairs, and the sinking fund.
- Test the access. Some sites depend on one bridge or road; drive it at peak hours.
- Think about resale. If most buyers are foreigners, the RM1 million floor limits the pool; New Straits Times reported resale difficulties for foreign owners in April 2026.
My property due diligence checklist covers the general checks that apply to every purchase.
Can foreigners buy homes on reclaimed land in Johor?
Yes, on the same terms as anywhere else in the state. Johor sets an RM1 million minimum for residential property, with only limited exceptions (for example, some serviced apartments sold by developers with state approval); no area is exempt as a whole. See Johor’s foreigner minimum price and quota.
- State consent. PTG Johor’s approval fee is 3% of the price, minimum RM30,000, plus RM2,000 per title, or 2% (minimum RM20,000) between immediate family (PTG Johor circular, from 1 July 2025). See state consent for transfers in Johor.
- Stamp duty. Transfers to foreign individuals and companies carry a flat 8% stamp duty on residential property from 1 January 2026; see stamp duty in Malaysia 2026.
- Visas are separate. MM2H’s SEZ/SFZ category in Johor is tied to Forest City (MM2H official site, checked November 2026); it is a visa route, not a price-floor exemption. I coordinate with a MOTAC-licensed MM2H agent; the authorities decide approval. See the MM2H eligibility checker or my MM2H property support page.
For how this fits with the wider Johor–Singapore Special Economic Zone, see my JS-SEZ guide for property buyers.
Where to buy if this matters to you
- Forest City: reclaimed islands in the western Straits, far from the city.
- Danga Bay: waterfront condos on original and reclaimed land.
- JB Sentral and Bukit Chagar: city-centre homes near the Causeway and RTS Link.
- Permas Jaya and Senibong: east-side waterfront on the Tebrau Strait.
- Iskandar Puteri: Puteri Harbour, Medini and the Second Link.
- Bukit Indah and Gelang Patah: established neighbourhoods inland.
- Pasir Gudang and Masai: the eastern coast; see also living near industrial areas.
Compare them on my JB property map. For the wider picture, see Iskandar Malaysia explained and Johor’s districts compared, including the Pontian district guide for the coast west of Forest City.
More Johor living guides: Johor property agencies: who does what · Waterfront and sea-view homes in JB · Flood risk in Johor Bahru · Johor’s future transport projects
Frequently asked questions
Which areas of Johor are built on reclaimed land?
The main reclaimed residential areas in Johor are Forest City off Gelang Patah, parts of the Danga Bay waterfront, the islands either side of the Johor–Singapore Causeway, and newer works in the Tebrau Strait off Masai. A separate industrial reclamation off Muar was proposed in 2022. Check each plot’s history, because many waterfront homes sit on original land.
Who approves land reclamation in Johor?
Land reclamation in Johor needs approval from the Johor state government, which controls the seabed as state land and issues titles through PTG Johor. The Department of Environment must also approve an environmental impact assessment, and the local council approves planning and building plans.
Does reclamation in Malaysia need an EIA?
Yes. Under the EIA Order 2015, coastal reclamation under 50 hectares is a First Schedule activity. Reclamation of 50 hectares or more, near environmentally sensitive areas, or for a man-made island falls under the Second Schedule, which includes public display of the report.
Are homes on reclaimed land in Johor freehold or leasehold?
Homes on reclaimed land in Johor can be either, because tenure depends on the terms the state granted when it alienated the land. Public debate over Forest City’s tenure in 2017 showed why buyers should read the registered title and its expiry date, not marketing material.
Is it safe to buy a condo on reclaimed land?
Condos on reclaimed land are normally built on deep piles designed for the ground conditions, but surrounding roads and car parks can settle over time. Check for sunken paving and cracks, ask about flooding at high tide and seawall upkeep, and use a registered engineer if you are unsure.
Can foreigners buy property on reclaimed land in Johor?
Foreigners can buy on reclaimed land in Johor under the normal state rules: an RM1 million minimum for residential property, with only limited exceptions (for example, some serviced apartments sold by developers with state approval); no area is exempt as a whole. State consent and 8% stamp duty also apply.
Thinking about a waterfront home in Johor?
Tell me the project or area, your budget and whether you are a Malaysian or foreign buyer. I will share what I know about the title and approvals, compare nearby options and arrange viewings. You can book an appointment, or a Zoom consultation if you are abroad.
Sources: Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015, P.U.(A) 195/2015, gazetted 28 August 2015 (FAOLEX copy), checked November 2026; Attorney General’s Chambers, Laws of Malaysia: National Land Code (Act 828), Environmental Quality Act 1974, checked November 2026; The Star, DOE approval of the Forest City detailed EIA, 14 January 2015; Mongabay (republished by Eco-Business), on the Forest City reclamation, its approval and compensation, 6 September 2018; Malay Mail, on reclamation work in Johor waters pausing over environmental concerns, 26 March 2015; Malaysiakini, on the debate over Forest City’s tenure, 15 March 2017; Malaysiakini via Yahoo News Malaysia, on the Muar reclamation proposal and its EIA, 10 March 2022; Bernama, on planned reclamation in the Tebrau Strait off Masai, 18 September 2025; Sarah Moser and Emma Avery, “Urbanizing a Mangrove Coastline in Malaysia”, FOCUS on Geography, 2024; Azlinor Sufian and Maizatun Mustafa, “Emerging issues on reclaimed land in Malaysia: alienation for freehold or leasehold?”, IIUM, May 2010; PTG Johor, Pekeliling Bil. 3 Tahun 2025 (foreign-interest approval fees), in force 1 July 2025; New Straits Times, “Foreigners hit Johor property resale wall”, 20 April 2026; MM2H official site, requirements and regulations, checked November 2026
Jason Lim, REN 84424, IQI Realty Sdn. Bhd. E (1) 1584/6. General information checked on 16 November 2026, not legal, engineering, tax or financial advice. Approvals, project plans and fees change; confirm with PTG Johor, the DOE, the local council and your lawyer, and use a registered engineer for building condition questions.