Jason Lim · Johor Bahru property advisor

Johor Bahru Roads and Traffic Guide (2026): Highways, Tolls, Peak Hours and Where to Live

中文 · Bahasa Melayu · Bahasa Indonesia

By Jason Lim, REN 84424 · IQI Realty · Checked on 16 November 2026

Johor Bahru’s traffic runs on a handful of roads: the North–South Expressway, the Eastern Dispersal Link to the Causeway, Jalan Skudai, the Tebrau and Pasir Gudang highways, the Second Link Expressway to Tuas and the Senai–Desaru Expressway. Jams build early in the morning towards the city and the Causeway, so choose a home by your daily route, not by distance.

Quick answer

  • Hotspots: a state study found 77 congestion hotspots in Greater JB, grouped into 41 clusters; 24 clusters in Johor Bahru, Pasir Gudang, Iskandar Puteri and Kulai are rated serious (Malay Mail, 6 May 2026).
  • Morning peak: a Jalan Skudai contraflow lane has been on trial on weekday mornings from 5.30am to 9am for inbound cars and vans, and Causeway peak congestion has shifted to around 6.30am (The Star, 10 August 2026; FMT, 25 February 2025).
  • Tolls: the Eastern Dispersal Link has had no toll since 1 January 2018; the Causeway (BSI), Second Link (Tanjung Kupang) and Senai–Desaru plazas still charge. Toll rates were kept unchanged for 2026 (RTM, 29 December 2025).
  • Causeway volumes: Singapore’s ICA counted more than 599,000 crossings at Woodlands and Tuas on 4 September 2026, a single-day record (Malay Mail, 1 November 2026).
  • Roadworks: the Senai–Desaru Expressway is being widened from two to four lanes near the Sungai Johor bridge, due April 2027 (RTM, 22 January 2026).

Which are the main highways and roads in Johor Bahru?

Most daily trips in JB use one or more of seven roads. Which one sits between a home and your work matters more than distance.

RoadWhat it connectsToll (November 2026)Main pinch points
North–South Expressway (southern end)Kuala Lumpur and the north to Skudai, Kempas and the JB city edgeTolledThe JB end at peak hours and festive weekends
Eastern Dispersal Link (EDL)The expressway near Tebrau and Pandan to the Causeway checkpoint (BSI)No toll since 1 January 2018; the Causeway plaza at BSI still chargesQueues backing up from the checkpoint
Jalan Skudai (Skudai Highway)Senai, Skudai and Tampoi to the city centreNo toll plaza on the main roadOne of the busiest corridors; a weekday-morning contraflow lane is on trial
Tebrau Highway (Jalan Tebrau)The city to Mount Austin, Tebrau, Setia Indah and MolekNo toll plaza on the main roadMall and junction traffic, evening returns
Pasir Gudang HighwayThe city to Permas Jaya, Masai and Pasir Gudang portNo toll plaza on the main roadLorries mixing with commuter cars
Second Link ExpresswaySenai and Iskandar Puteri to the Second Link bridge and TuasTolled for cars at Tanjung Kupang; no motorcycle toll since 1 January 2019The Kompleks Sultan Abu Bakar checkpoint at peak
Senai–Desaru ExpresswaySenai to the Pasir Gudang area, Kota Tinggi district and DesaruTolledTwo-lane sections under widening near the Sungai Johor bridge
Sources: theSun on the EDL toll ending from 1 January 2018; The Star, 4 November 2018, on Second Link motorcycle tolls; RTM and The Star, 22 January 2026, on the Senai–Desaru widening; The Star, 10 August 2026, on Jalan Skudai. The toll status of Jalan Skudai, the Tebrau Highway and the Pasir Gudang Highway, and the “main pinch points”, are my own observations as a JB agent.

Living beside any of these roads brings noise too; see highway and railway noise near a home.

When are the peak traffic hours in Johor Bahru?

JB has a sharp morning peak because many residents leave early for Singapore or for factories. The Jalan Skudai contraflow lane, on trial since mid-2026, runs from 5.30am to 9am on weekdays for traffic heading into the city (The Star, 10 August 2026), a good guide to the inbound rush.

  • Before dawn to about 9am: into the city and towards both checkpoints. In February 2025 the Home Ministry said the Causeway’s peak had shifted from about 3.45am–4.30am to around 6.30am as processing improved (FMT, 25 February 2025).
  • Evening: commuters returning from Singapore and the industrial areas, plus mall traffic.
  • Friday and Sunday evenings: in my experience, weekend visitors from Singapore fill the checkpoint approaches and the EDL.
  • School holidays and long weekends: the heaviest checkpoint days; see Johor public holidays 2027.
  • Heavy rain: afternoon storms slow every main road; see my JB weather guide and, for low-lying roads, the flood risk guide.

How bad is the Causeway congestion, and what is being done?

Singapore’s Immigration and Checkpoints Authority (ICA) said more than 6.1 million travellers crossed at Woodlands and Tuas during the 4–14 September 2026 school holidays, with a record of more than 599,000 crossings on 4 September. Some travellers waited up to three hours at peak times (Malay Mail, 1 November 2026, citing ICA).

On the Malaysian side, the Bangunan Sultan Iskandar (BSI) checkpoint is the country’s largest customs, immigration and quarantine (CIQ) complex. Its busiest day was 20 December 2024, with 375,828 traveller movements. In February 2025 the Home Ministry said clearance that once took up to three hours took under an hour, and targeted a cut in peak-hour congestion of up to 70% for Visit Malaysia 2026 (FMT, 25 February 2025).

Measures in use or coming:

  • QR clearance: Singapore’s MyICA app and Malaysia’s MyNIISe app let many travellers clear the land checkpoints with a QR code (ICA, updated 27 October 2026; Malay Mail, 2 July 2026).
  • More gates: BSI had 68 bus immigration e-gates and 16 motorcycle lanes with facial recognition in July 2025; more than 60,000 people a day crossed by bus (The Star, 24 July 2025).
  • The RTS Link: Singapore’s Land Transport Authority (LTA) and Malaysia’s Ministry of Transport said on 2 October 2026 that Bukit Chagar–Woodlands North passenger service is expected in February 2027, subject to safety certification and approvals.

At the Second Link, a bus from the Kompleks Sultan Abu Bakar (KSAB) checkpoint to Tuas took 5 to 8 minutes in light traffic and up to 40 minutes in jams (The Star, 24 July 2025). For daily crossing, read living in JB and working in Singapore and Woodlands vs Bukit Chagar for the RTS commute.

Which tolls have been removed or reduced in Johor?

Toll changes come through federal announcements, usually at Budget time or before festivals:

Toll changeDateWhat it means
Eastern Dispersal Link toll removedFrom 1 January 2018No toll on the EDL itself. Drivers crossing to Singapore still pay at the Causeway plaza.
Second Link motorcycle toll removedFrom 1 January 2019 (announced in Budget 2019)Motorcycles cross the Second Link without a Malaysian toll; cars still pay at Tanjung Kupang.
Toll rates kept unchangedFor 2026 (reported 29 December 2025)The federal government kept toll rates on all highways, including the Senai–Desaru Expressway, unchanged for 2026.
Festive toll reductionsFor example 14–15 February 2026 (Chinese New Year)The reduction did not apply at the BSI and Tanjung Kupang plazas, so checkpoint users paid normal rates.
New Bestari Perdana plaza on the Senai–Desaru ExpresswayOpened 22 January 2026Opened with an initial no-toll period; check the current rate with the Malaysian Highway Authority (LLM).
Sources: theSun (EDL, December 2017); The Star, 4 November 2018; RTM, 29 December 2025; motoring news report, 7 February 2026; Bernama, 22 January 2026. Check current rates with LLM before you budget.

Treat claims that “all JB tolls are going” with care: the toll waiver at BSI and Tanjung Kupang when the borders reopened in April 2022 lasted seven days (theSun, 6 April 2022). Malaysian tolls are cashless, by card or RFID tag.

Want a home that fits your daily route?

Tell me where you work or study, the time you leave and your budget. I'll suggest areas on the right side of the main jams and arrange viewings at the hour you would actually travel.

WhatsApp Jason

Which road projects will change JB traffic next?

  • Senai–Desaru Expressway widening (under construction): a RM128.5 million project is widening 9.34km from the Sungai Johor bridge to Sungai Semenchu from two to four lanes, due for completion in April 2027; it was 53.19% complete in January 2026. A further RM117 million under the 13th Malaysia Plan was approved for about 4km from Cahaya Baru to the bridge, with the start date to be set by LLM (RTM and Bernama, 22 January 2026).
  • Pasir Gudang connector (open): 5.1km from the Senai–Desaru Expressway to Jalan Kong Kong and Tanjung Langsat, with a Bestari Perdana ramp opened on 22 January 2026 (The Star).
  • Jalan Skudai contraflow (trial running): about 6km on Jalan Skudai from the MBJB Gateway to Bandar Baru Uda, for cars and vans on weekday mornings from 5.30am to 9am; officials are assessing it before deciding whether to keep it (The Star, 10 August 2026).
  • Congestion action plan: the Greater Johor Bahru and JS-SEZ traffic study, run through the Johor Public Transport Corporation (PAJ), lists Skudai corridor upgrades, lorry routes and schedules, and more freight on the 39.9km Kempas Baru–Pasir Gudang cargo rail line (Malay Mail, 6 May 2026).
  • Public transport (proposed or under way): Budget 2027 named an elevated Autonomous Rapid Transit (e-ART) as JB’s main urban transit solution, but no route or opening date had been set by 16 November 2026 (Malay Mail, 9 October 2026). See my e-ART guide and the Johor future transport projects tracker.

How does your commute affect where you should buy in JB?

Start from where you will be at 8am on a weekday. My general guidance, not an official rating:

If you work or study in…Areas that usually suitMain routeWatch out for
Central or north Singapore (via Woodlands)JB Sentral, Bukit Chagar, city centre; Mount Austin and Tebrau for driversWalk to BSI or the RTS Link; the EDL for driversCheckpoint queues; parking near the city stations
West Singapore (Tuas, Jurong)Iskandar Puteri, Bukit Indah, Gelang PatahSecond Link ExpresswayTanjung Kupang toll and KSAB queues at peak
JB city centreCity centre, Danga Bay, Tampoi, Permas JayaCoastal road, Jalan Skudai, Pasir Gudang HighwayJalan Skudai in the morning rush
Pasir Gudang port and industryPermas Jaya, Masai, Pasir GudangPasir Gudang Highway; Senai–Desaru connectorLorry traffic at shift changes
Senai, Kulai, the airport and SedenakKulai, Senai, SkudaiNorth–South Expressway, Jalan SkudaiThe Skudai stretch towards the city
Kota Tinggi or DesaruKota Tinggi, Desaru, east JBSenai–Desaru ExpresswayWidening works until about April 2027
My general guidance as a JB agent, checked November 2026. Road facts from the sources listed below.

Three rules I give buyers:

  • Test the drive at your real hour. A 20-minute drive at noon can take an hour at 7am. Roadworks slow things too.
  • Check the estate’s exits. Some townships empty onto one junction.
  • For Singapore commuters, walking distance beats driving distance. See buying near the JB checkpoint and homes near the RTS Link station.

What should drivers crossing to Singapore know?

Foreign buyers: in Johor, foreigners face an RM1 million minimum for residential property, with only limited exceptions (for example, some serviced apartments sold by developers with state approval); no area is exempt as a whole. See the minimum price guide. For MM2H applicants, I coordinate with a MOTAC-licensed MM2H agent and handle the property side; see MM2H property support.

Where to buy if this matters to you

Compare them on my JB property map.

More Johor living guides: Best areas to live in JB · Cost of living in JB · RTS Link 2026 update · Johor industrial parks guide

Frequently asked questions

What are the worst traffic times in Johor Bahru?

The worst Johor Bahru traffic is usually the weekday morning rush, from before dawn to about 9am, into the city and towards the two Singapore checkpoints. Evenings, Friday and Sunday nights, and school holidays are also heavy. A Jalan Skudai contraflow lane has been on trial on weekday mornings from 5.30am to 9am (The Star, 10 August 2026).

Is there a toll on the Eastern Dispersal Link in Johor Bahru?

No. Toll collection on the Eastern Dispersal Link (EDL) in Johor Bahru ended on 1 January 2018 (theSun). Drivers using the EDL to reach Singapore still pay the toll at the Causeway plaza at Bangunan Sultan Iskandar (BSI).

Have Johor highway tolls gone up in 2026?

No. The federal government kept toll rates on all highways unchanged for 2026, including the Senai–Desaru Expressway in Johor (RTM, 29 December 2025). The Chinese New Year festive toll reduction on 14–15 February 2026 did not apply at the BSI and Tanjung Kupang checkpoint plazas (motoring news report, 7 February 2026).

When will the Senai–Desaru Expressway widening finish?

The Senai–Desaru Expressway widening from two to four lanes, on 9.34km from the Sungai Johor bridge to Sungai Semenchu, was due for completion in April 2027 (RTM, 22 January 2026). A further 4km from Cahaya Baru to the bridge was approved with RM117 million; LLM is to set its start date.

Which JB areas are best for avoiding Causeway traffic?

For avoiding Causeway road traffic, JB Sentral, Bukit Chagar and the city centre work best because you can walk to the BSI checkpoint and, from the February 2027 target, the RTS Link. People working in west Singapore often prefer Iskandar Puteri, Bukit Indah or Gelang Patah near the Second Link instead.

Choosing a JB home around your commute?

Tell me where you need to be each morning, how you will travel and your budget. I will shortlist areas on the right side of the main jams and time viewings so you can try the route. You can also book an appointment, or a Zoom consultation if you are still abroad.

Sources: Malay Mail, “Johor to trial Jalan Skudai contraflow lane ahead of RTS Link launch in 2027”, 6 May 2026; FMT, “Govt aiming to reduce peak-hour congestion at Johor Causeway by up to 70%”, 25 February 2025; Malay Mail, ICA warning on Deepavali checkpoint delays and September 2026 crossing figures, 1 November 2026; The Star, “Johor drives transport upgrades, Singapore links”, 24 July 2025; RTM, toll rates kept for 2026 on the Senai–Desaru Expressway and other highways, 29 December 2025; RTM, Senai–Desaru Expressway widening extended by 4km, 22 January 2026; The Star, “RM117mil allocated to ease congestion on Senai-Desaru Expressway”, 22 January 2026; Bernama, Bestari Perdana toll plaza and Senai–Desaru upgrade, 22 January 2026; theSun, toll abolition in three states from 1 January, including the EDL, December 2017; The Star, “M-cyclists revved up over no toll at Second Link”, 4 November 2018; The Star, “Jalan Skudai contra lane to ease traffic”, 10 August 2026; motoring news report, festive toll reduction on 14–15 February 2026 excluding the BSI and Tanjung Kupang plazas, 7 February 2026; theSun, toll exemption at the Causeway and Tanjung Kupang ends on 8 April, 6 April 2022; LTA and Ministry of Transport Malaysia, RTS Link service targeted for February 2027, 2 October 2026; Malay Mail, “Budget 2027: e-ART to be main urban public transport solution in Johor Bahru”, 9 October 2026; ICA, QR code for immigration clearance at land checkpoints, updated 27 October 2026; Malay Mail, on the MyNIISe app, 2 July 2026; LTA OneMotoring, cars and motorcycles registered in Malaysia, updated 23 June 2026; Bernama, VEP enforcement on Singapore-registered vehicles begins, 1 July 2025

Jason Lim, REN 84424, IQI Realty Sdn. Bhd. E (1) 1584/6. General information checked on 16 November 2026, not legal or travel advice. Toll rates, roadworks, checkpoint rules and opening dates change; confirm with the Malaysian Highway Authority (LLM), JPJ, LTA, ICA and the Immigration Department before you travel or commit.