Jason Lim · Johor Bahru property advisor

Car porch awning and extension permits in Johor (2026): council rules, fees and risks

中文 · Bahasa Melayu · Bahasa Indonesia

By Jason Lim, REN 84424 · IQI Realty · Checked on 15 November 2026

This guide is for owners and buyers of landed houses in Johor Bahru, including buyers from Singapore, Indonesia, India and China and MM2H participants. The short answer: a roof over your car porch needs your city council’s approval. A light awning can usually go through a simple awning permit, while a concrete porch roof, an enclosed garage or anything past the setbacks needs plans signed by a qualified professional. Building first can mean a penalty fee or a demolition notice.

Quick answer

  • Who approves: MBJB, MBIP, MBPG or MPKu, whichever is named on your assessment bill.
  • Light awnings: MBJB’s temporary awning permit covers ground-floor awnings in light materials on individually titled houses. Concrete is not allowed under it.
  • MBJB fees: a one-off RM30 (RM50 for corner lots), plus RM10 a year for low-cost homes or RM30 a year for others (form updated July 2022).
  • Heavier works: a concrete porch roof or an enclosed garage counts as erecting a building under section 70 of Act 133 and needs plan approval.
  • Without approval: MBJB lists a penalty plan fee of 10 times the processing fee; the Act allows fines of up to RM50,000 and demolition orders.

Awning, porch roof or extension: which one are you building?

Many JB houses have an open car porch (anjung kereta) that the main roof only partly covers. How the council treats a new roof depends on how heavy it is and where it sits.

What you want to buildUsual approval routeDrawing by
Light ground-floor awning (sengkuap) over the porch or yardAwning permit (MBJB temporary permit; MBIP awning form)A marked-up sketch
Open porch roof or veranda within the standard setbacksMinor works permitSubmitting person
Concrete flat roof over the porchPlan approval for alterations and additionsSubmitting person, with a registered engineer for the structure
Walling in the porch as a garage or roomPlan approval; may not be approvable if it breaks setbacksSubmitting person
Upper-floor awning up to the boundaryNot allowed at MBJBNot applicable
Sources: Act 133, s.70; MBJB awning form (July 2022), minor works guideline (2016) and checklist MBJB/OSC/UT/P2_14 (December 2022); MBIP awning form; checked November 2026. Not legal advice.

A submitting person is a registered architect, engineer or building draughtsman; see when you need an architect or engineer.

Which council handles your house?

Building approval comes from the local council (pihak berkuasa tempatan): MBJB for the city centre, Tebrau and Mount Austin; MBIP for Iskandar Puteri, Bukit Indah, Gelang Patah and parts of Skudai; MBPG for Pasir Gudang and Permas Jaya; and MPKu for Kulai and Senai. Area names do not always follow council lines, so go by your assessment (cukai taksiran) bill and my guide to JB’s local councils.

MBJB’s temporary awning permit

Since 1 January 2020, MBJB has offered a temporary house awning permit (Permit Sementara Awning Rumah Kediaman) as a quicker route than a full alteration application through a consultant. Its form, last updated on 1 July 2022, sets these conditions:

  • Individual titles only. Terrace, semi-detached, cluster and detached houses; strata-titled property is not allowed under this route.
  • Ground floor only. Upper-floor awnings built up to the boundary are prohibited, and MBJB says it issues demolition notices for them.
  • Light materials. Polycarbonate, aluminium composite panel, metal deck or glass. Concrete or permanent construction is not allowed.
  • Placement. At the front, up to the boundary fence. Side projections are limited to 300 mm, with a 1.5 m gap from the boundary for semi-detached and cluster end lots. Rear awnings only where the back lane is at least 6 m wide, projecting 0.5 m.
  • Water and neighbours. Side edges need a gutter, rainwater must not flow into the neighbouring house, and posts on a dividing wall need consent from the neighbours on both sides.
  • Owner’s responsibility. The owner answers for the structure. MBJB can order repairs and can withdraw the permission at any time for breaches, after which the awning must come down.
MBJB feeLow-cost houseMedium- or high-cost house
Processing, once (intermediate or end lot)RM30RM30
Processing, once (corner lot)RM50RM50
Permit, 1 yearRM10RM30
Permit, 3 yearsRM30RM90
Permit, 5 yearsRM50RM150
Source: MBJB awning permit form (updated 1 July 2022) and 2022 brochure, checked November 2026. Contractor charges are extra; note the renewal date.

To apply, submit the form with your IC, latest assessment bill, title and lot plan, photos, a sketch and any neighbours’ consent (tenants also need the owner’s consent) at the Menara MBJB counter or by email. MBJB sends a payment reference; its brochure gives about two weeks for approval. Keep the approval letter for when you sell.

MBIP, MBPG and MPKu

  • MBIP. Its awning form needs a sketch plan and lists a processing fee of RM35 (intermediate and end lots) or RM38 (corner lots) and a permit fee of RM10 or RM50 depending on the house’s cost category. It warns of up to 10 times the fee for starting before approval.
  • MBPG. In September 2022 the Pasir Gudang mayor said homeowners who build garages in front of their houses would pay a fee from 2023, citing structures that encroach on or block neighbours (The Star). Check MBPG’s current rules. Its 2024 customer charter set 30 working days to decide a complete house extension plan.
  • MPKu. Kulai publishes a residential additions and alterations form (Borang Ubah Tambah Rumah Kediaman); ask whether a lighter awning route applies.

Looking at a house with a covered porch?

Send me the listing or the address. Before you offer, I ask the seller for the awning permit or approved plans and flag anything your lawyer and bank should know.

WhatsApp Jason

Concrete porch roofs, garages and porch extensions

Section 70(1) of the Street, Drainage and Building Act 1974 (Act 133) bars anyone from erecting a building without the council’s prior written permission. Under section 70(16), adding to a house with new foundations or a new or bigger roof, or rebuilding outer or party walls, counts as erecting. A concrete porch roof on new columns, a walled garage and a porch turned into a room all qualify.

MBJB’s minor works guideline (updated 2016) lets houses with a CCC or Certificate of Fitness use standard sketch plans for small additions, working with 6.0 m from the front road reserve, 2.5 m from a side road reserve on corner lots and 2.0 m from the lot boundary to the roof projection. Its December 2022 checklist charges RM3.50 per m² (minimum RM35) for a porch, veranda or open shed, RM54 for the building materials permit and RM30 for planning permission. Corner lots need extra care with the side setback (see corner lot vs intermediate terrace), and concrete slabs need a registered engineer. My renovation permit guide covers the full process.

Rainwater, drains and the neighbours

  • Where the water goes. Gutters and downpipes should lead into your own drain, not over the shared wall (see blocked drains in the monsoon).
  • The joint with the main roof. Leaks often start where the awning meets the original roof; ask how the flashing will be done (see roof leaks in landed homes).
  • Standing water. MBJB’s form makes owners responsible for mosquito breeding in gutters (see dengue prevention).
  • The shared wall. Posts on a party wall need neighbour consent and should not load a wall not designed for it (see party walls).
  • Outside your lot. Drains, road reserves and back lanes are not part of your title. In June 2023 MBIP removed extensions and awnings blocking drains at about 120 business premises in Skudai, and the state said councils would act under Act 133 (The Star).

If a neighbour’s porch roof sends water into your home, talk first, then complain through MyAduan Johor, which since 1 April 2026 covers MBIP, MBPG and MPKu as well as MBJB (The Star, September 2026). See my neighbour dispute guide.

What happens if you build without approval

ConsequenceWhat the source says
Penalty plan feeMBJB lists a penalty plan fee (wang pelan berdenda) of 10 times the processing fee; MBIP’s awning form warns of up to 10 times.
Late approvalMBIP said works meeting the rules can be approved later, with a penalty of up to 30% of their cost (The Star, October 2021).
FinesAct 133, s.70(13): up to RM50,000, up to three years’ jail or both, plus up to RM1,000 a day.
DemolitionSection 72 lets the council order the structure demolished and recover its costs.
Permit withdrawnMBJB can withdraw an awning permit for breaches; the awning must then come down.
Sources: Act 133, ss.70 and 72; MBJB checklist (December 2022) and awning form (July 2022); MBIP awning form; The Star, 21 October 2021; checked November 2026. Not legal advice.

Section 70(17) presumes, until proved otherwise, that building work was done by the landowner, so a notice comes to you even if a contractor or tenant built the roof. A neighbour having the same porch roof does not make yours approved.

Gated estates and landed strata houses

Gated estates often fix awning style, colour and projection in their design guidelines and may ask for a renovation deposit. MBJB’s awning permit is for individual titles only, and its minor works checklist asks landed strata owners for a JMB support letter. You need both management and council approval. See gated and guarded homes and landed strata titles.

Practical points before you build

  • Height and the gate. Leave headroom for taller vehicles and space for the gate motor (see auto gate safety).
  • Heat and wiring. Clear sheets can make the porch hot (see heat insulation); run wiring for lights or an EV charger before the roof goes on.
  • Contract and insurance. Write down who applies for the permit, materials, gutter route and warranty (see hiring a contractor), and tell your insurer about the new structure (see home insurance).

Buying a house with a porch roof or extension

  1. Ask for the paperwork. The awning permit and renewals, or approved plans for heavier works. Missing papers can be requested from the council by the owner (see copies of approved plans).
  2. Compare with what is built. A concrete roof on a light-awning permit, a walled-in porch or anything over the drain is a gap.
  3. Tell the bank early. A valuer may give little value to unapproved space (see low valuations).
  4. Use the SPA. Your lawyer can add a seller’s warranty or agree who pays to regularise or remove the works; reflect the risk in your offer.

Unapproved extensions often cause delays when a house is sold, because buyers’ lawyers, banks and valuers may ask for approved plans or a CCC for the works (a Selangor council official made a similar point to The Star in August 2022). See illegal extensions in subsale houses and the subsale inspection checklist.

Foreign owners and landlords

The rules are the same for foreign owners. Foreigners can buy Johor residential property only from RM1 million, with only limited exceptions (for example, some serviced apartments sold by developers with state approval); no area is exempt as a whole (see Johor’s foreigner minimum price). If you let the house, ban alterations without your written consent (see managing JB property from overseas). For MM2H, I coordinate with a MOTAC-licensed MM2H agent and handle the property side.

Where to buy if this matters to you

Compare them on my JB property map.

More Johor living guides: Renovation permits in JB · Illegal extensions in subsale houses · Boundary walls and fences in Johor · Garden landscaping for landed homes · Renovating a new house step by step

Frequently asked questions

Do I need a permit for a car porch awning in Johor Bahru?

Yes. Awnings and porch roofs need approval from MBJB, MBIP, MBPG or MPKu, as named on your assessment bill. MBJB and MBIP have simple permits for light awnings; concrete roofs and enclosed garages need plans signed by a submitting person.

How much is an awning permit at MBJB?

Under MBJB’s form updated in July 2022, a one-off processing fee of RM30 (RM50 for corner lots), plus a permit fee of RM10 a year for low-cost homes or RM30 a year for medium- and high-cost homes, with 3- and 5-year options.

Can I build a concrete roof over my car porch?

Only with plan approval. MBJB’s awning permit does not allow concrete. A concrete porch roof counts as erecting a building under section 70 of Act 133, so it needs plans from a submitting person and a registered engineer’s certification.

Do I need my neighbour’s consent for a porch awning?

If posts or beams sit on a shared wall, yes: MBJB’s form needs written consent from the neighbours on both sides. Rainwater must also not run into the neighbour’s house.

What happens if my porch roof was built without approval?

The council can charge a penalty plan fee, which MBJB lists as 10 times the processing fee, or order demolition under section 72 of Act 133, with fines of up to RM50,000. MBIP has said compliant works can be approved later with a penalty of up to 30% of their cost.

Should I buy a house with an unapproved porch extension?

You can, but the risk passes to you, because the Act presumes the owner did the work. Ask for the permits before you offer, tell the bank early, and agree in the SPA who pays to regularise or remove the works.

Buying or upgrading a landed home in JB?

Tell me the area, budget and house type. For any house with a porch roof or extension, I ask the seller for the permits and approved plans before you offer and point out what your lawyer, bank and insurer should know. You can also book an appointment for viewings, or a Zoom consultation if you are abroad.

Sources: Street, Drainage and Building Act 1974 (Act 133), Part V, sections 70 and 72 (as published by the National House Buyers Association), checked November 2026; MBJB, Permit Sementara Awning Rumah Kediaman (house awning temporary permit form and guide), updated 1 July 2022, checked November 2026; MBJB, house awning brochure, 2022, checked November 2026; MBJB, Kerja-Kerja Kecil Rumah Kediaman (minor works guideline for houses), updated 2016, checked November 2026; MBJB, checklist for minor renovation permit plans (MBJB/OSC/UT/P2_14), December 2022, checked November 2026; MBIP, awning permit application form (MBIP-JB-PS5-02-PIN.1), checked November 2026; MPKu, Borang Ubah Tambah Rumah Kediaman (downloads page), checked November 2026; MBPG, customer charter achievement, January to December 2024 (published July 2025), checked November 2026; The Star, “Pasir Gudang homeowners who build garages must pay a fee from next year”, 27 September 2022; The Star, “MBIP: Seek approval before carrying out renovations”, 21 October 2021; The Star, “Housing exco: City council will take action if structures obstruct”, 15 June 2023; The Star, “Get approval for renovations or face hassles when selling house”, 16 August 2022; The Star, “Johor steps up complaint handling”, 28 September 2026; The Star, “MyAduan Johor to include more councils by Q2 2026”, 23 December 2025; New Straits Times, “Foreigners hit Johor property resale wall”, 20 April 2026

Jason Lim, REN 84424, IQI Realty Sdn. Bhd. E (1) 1584/6. General information checked on 15 November 2026, not legal advice. Council forms, fees and setbacks change and differ between MBJB, MBIP, MBPG and MPKu; confirm with your council, your estate management and a registered professional before you build or buy.