Jason Lim · Johor Bahru property advisor

10 years in Malaysian property · Johor Bahru & Kuala Lumpur · Jason Lim, REN 84424 · 中文版 · Bahasa Melayu
Home › Johor Bahru projects › Iskandar Puteri › Aspira LakeHomes

Gerbang Nusajaya, Iskandar Puteri · Under construction · Keys 2027

Aspira LakeHomes

The newer phases of UEM Sunrise’s freehold lakeside terrace estate in Gerbang Nusajaya: 253 double-storey homes in Phases 4 to 6, priced RM685,000 to RM1,530,600 on the advertising permits, with completion expected between April and September 2027.

Freehold253 units2-storey terraces2,072–2,821 sq ftRM685k–1.53m on permit

Replies on WhatsApp from Jason himself · No obligation

253homes in Phases 4–6
Apr–Sep 2027expected completion
~15 minto Tuas checkpoint (developer)

Answer block

Aspira LakeHomes at a glance

Every figure here comes from the developer, the government housing register or the property records named at the foot of the page. Where sources disagree, the range is shown. Where nobody has published a number, it is not on this page.

Development

Aspira LakeHomes, Phases 4, 5 and 6

Part of UEM Sunrise’s Gerbang Nusajaya township; Phases 1–3 (366 homes) are already built

Developer

Nusajaya Rise Sdn Bhd

UEM Sunrise subsidiary; developer licence 14228/02-2029/1559(A), valid 8 Feb 2024 – 7 Feb 2029

Address

Gerbang Nusajaya, Iskandar Puteri

Sales office on Persiaran Sentral, 79200 Iskandar Puteri

Tenure

Freehold

Land encumbrance: none (developer’s permit page)

Homes

253 double-storey terraces

Phase 4: 65; Phase 5: 125 (5A 43, 5B 82); Phase 6: 63

Advertising permits

Three, one per phase

Phase 4: 14228-8/05-2027/0441(N)-(S), to 19 May 2027; Phase 5: 14228-12/09-2027/0793(N)-(S), to 2 Sep 2027; Phase 6: 14228-7/05-2027/0412(N)-(S), to 12 May 2027

Permit price band

RM685,000 – RM1,530,600

Phase 4 RM685,000–1,236,500; Phase 5 RM809,500–1,530,600; Phase 6 RM706,000–1,235,300

Keys due

April 2027 to September 2027

Expected completion on the developer’s permit page; construction progress not confirmed

Layouts

2,072–2,821 sq ft

Up to 4 bedrooms and 4 bathrooms, 2 car parks, lots from 24 × 75 ft

Foreign buyers

Not available

Developer says non-Malaysian citizens cannot buy; land carries a restriction in interest

Why this address

Four things buyers weigh at Aspira LakeHomes

Large freehold terraces in an established lakeside estate near the Second Link. Here is the case, and the catch.

🏡

Large lots and big built-ups

Homes sit on lots from 24 × 75 ft with built-ups of about 2,072 to 2,821 sq ft, larger than many terraces in the township.

🛣️

Near the Second Link

The estate is close to the Gerbang Nusajaya interchange; UEM Sunrise puts the drive to the Tuas checkpoint at about 15 minutes.

🏘️

An estate that already exists

Phases 1 to 3 are built and lived in, so buyers can see the neighbourhood, the lake and the facilities before committing.

⚖️

What to weigh: completion, eligibility and supply

Keys are expected from April to September 2027 and the ministry’s progress figures could not be checked, so confirm the SPA date and progress before you sign. Foreigners cannot buy, and the developer’s Phase 4 and 5A pages list Bumiputera lots only. Aspira Hills (901 terraces, keys 2026–2027), Aspira ParkHomes and the earlier LakeHomes phases mean plenty of similar homes for resale and rent.

The development

Aspira LakeHomes, decoded

Three new phases of double-storey terraces added to the existing Aspira LakeHomes estate in Gerbang Nusajaya, Iskandar Puteri. Phases 4 and 6 opened for sale in July 2024 and Phase 5 in September 2024.

253Homes
3Phases
2Storeys
4Bedrooms (up to)

Facilities

As listed on the developer’s project pages, October 2026. Floor levels and locations are not published.

Active

Sport and fitness

  • Gymnasium and sauna
  • Multipurpose hall with 2 badminton courts
  • Tennis court

Residents

Community

  • Community clubhouse
  • Surau
  • Lakes within the estate

Where the project is now

13 May 2024Phase 6 permit issued (63 homes)
20 May 2024Phase 4 permit issued (65 homes)
Jul 2024Phases 4 and 6 open for sale (The Edge)
Sep 2024Phase 5 permit issued and Phase 5 unveiled (125 homes)
Apr 2027Phases 4 and 6 expected completion
Sep 2027Phase 5 expected completion
Ask me what the brochure doesn’t tell you

Layouts

All 6 Aspira LakeHomes layouts

Six of the published types, from 2,072 to 2,684 sq ft. Phase 5 adds Types C3, C4, D1 and D2, up to about 2,821 sq ft, whose individual sizes are not broken out. Sizes from UEM Sunrise’s project pages, checked October 2026. Tap any layout and the drawing comes to your WhatsApp.

Type B1 (intermediate) — 2,072 sq ft

2,072 sq ft · intermediate terrace · up to 4 bedrooms

TerraceIntermediate
Get this floor planAsk price & availability →

Type B1 (end) — 2,149 sq ft

2,149 sq ft · end terrace

TerraceEnd
Get this floor planAsk price & availability →

Type C1 (corner) — 2,179 sq ft

2,179 sq ft · corner terrace

TerraceCorner
Get this floor planAsk price & availability →

Type B2 (intermediate) — 2,263 sq ft

2,263 sq ft · intermediate terrace

TerraceIntermediate
Get this floor planAsk price & availability →

Type B2 (end) — 2,303 sq ft

2,303 sq ft · end terrace

TerraceEnd
Get this floor planAsk price & availability →

Type C2 (corner) — 2,684 sq ft

2,684 sq ft · corner terrace

TerraceCorner
Get this floor planAsk price & availability →

Free PDF: JB Condo Prices & Rents 2026

Recorded prices and rents for 122 JB condos, plus asking prices, rents and yields by area. Compare this project with its neighbours before you make an offer. What is inside

Send me the guide

Location & connectivity

Where Aspira LakeHomes sits

Gerbang Nusajaya, Iskandar Puteri, Johor. Sales office: Persiaran Sentral, Gerbang Nusajaya, 79200 Iskandar Puteri.

Open in Google Maps →
Maintenance. UEM Sunrise has not published a maintenance or security fee for the new phases. Ask for it, and for the SPA completion date, before you book.
Tadika Al Ummah, Aspira Square~0.3 kmdeveloper’s list
SK Ladang Pendas~3.3 kmdeveloper’s list
SMK Gelang Patah~3.8 kmdeveloper’s list
Gelang Patah town~4.4 kmdeveloper’s list
EduCity~6 kmdeveloper’s list
Legoland Malaysia~8.2 kmdeveloper’s list
Gleneagles Hospital Medini~8.3 kmdeveloper’s list
Mall of Medini~9 kmdeveloper’s list

The government record

The permit record for Aspira LakeHomes, Phases 4 to 6

These are the details the developer must publish under its advertising and sales permit: the phase, the number of homes, the price band filed for the permit and the expected handover date. A brochure price can change; the permit band is what was filed.

Project codePhase or typeUnitsPrice band on the permitKeys due
14228-8Phase 465RM685,000 – RM1,236,500Apr 2027
14228-12Phase 5 (5A and 5B)125RM809,500 – RM1,530,600Sep 2027
14228-7Phase 663RM706,000 – RM1,235,300Apr 2027

Advertising and sales permits: Phase 4 14228-8/05-2027/0441(N)-(S), valid 20 May 2024 to 19 May 2027; Phase 5 14228-12/09-2027/0793(N)-(S), valid 3 Sep 2024 to 2 Sep 2027; Phase 6 14228-7/05-2027/0412(N)-(S), valid 13 May 2024 to 12 May 2027. Developer licence 14228/02-2029/1559(A), Nusajaya Rise Sdn Bhd (UEM Sunrise). Read on UEM Sunrise’s permits and licences page, 15 October 2026.

The recorded numbers

The price numbers

Recorded sales and asking prices are different things. Transacted figures come from deals recorded with the government valuation department; asking figures are what owners or the developer are listing at.

MeasureFigureSource and date
Price on the permit
Phase 4 (65 homes)
RM685,000 – RM1,236,500UEM Sunrise permits page, Oct 2026
Price on the permit
Phase 5 (125 homes)
RM809,500 – RM1,530,600UEM Sunrise permits page, Oct 2026
Price on the permit
Phase 6 (63 homes)
RM706,000 – RM1,235,300UEM Sunrise permits page, Oct 2026
Built-up
all published types
About 2,072 – 2,821 sq ftUEM Sunrise project pages, Oct 2026
Asking sale, nearby
completed Phases 1–3, not this project
From about RM730,000PropertyGuru, Oct 2026
Asking rent, nearby
completed Phases 1–3, not this project
From about RM900 a monthPropertyGuru, Oct 2026

The permit rows are the price bands on each phase’s advertising and sales permit as published by UEM Sunrise, read 15 October 2026; the project page shows “from RM712,300”, so records differ at the low end. They are not transactions. The last two rows are asking prices for the completed earlier phases of the estate, not the new phases. No maintenance fee has been published.

Track record

About Nusajaya Rise Sdn Bhd (UEM Sunrise)

Aspira LakeHomes is developed by Nusajaya Rise Sdn Bhd, a subsidiary of UEM Sunrise Berhad, the master developer of Gerbang Nusajaya.

The developer licence is 14228/02-2029/1559(A), valid to February 2029. Building plans were approved by Majlis Bandaraya Iskandar Puteri.

Around the building

What is near Aspira LakeHomes

The closest places on the map, measured in a straight line from the building. Driving distances are longer.

🚉 Getting around

  • Gelang Patah Bus Terminal~3.3 km

🛍️ Malls

  • Big Box Retail Park~4.4 km
  • Mall of Medini~4.6 km
  • Box in Box~4.7 km

🎓 Schools

  • SK Ladang Pendas~900 m
  • Raffles American International School~2.7 km

🏛️ Colleges and universities

  • Multi Varsity Complex~2.5 km
  • University of Southampton~2.5 km
  • Netherlands Maritime Institute of Technology~2.5 km

🏥 Hospitals

  • Afiniti Wellness~4.7 km

Map data © OpenStreetMap contributors. Names as recorded on the map; check opening and enrolment details yourself.

Straight answers

Frequently asked questions

When will it be completed?

The developer’s permit page gives April 2027 for Phases 4 and 6 and September 2027 for Phase 5. Construction progress figures from the ministry could not be checked, so confirm progress and the completion date in your SPA, which is the date that counts for late delivery claims.

Can foreigners buy at Aspira LakeHomes?

In Johor a foreign buyer generally needs to pay at least RM1 million for a residential property, with state consent. Since 1 July 2025 Johor charges foreign buyers a consent levy of 3% of the price or RM30,000, whichever is higher, and stamp duty on transfers to foreigners is a flat 8% from 1 January 2026. Bumiputera lots, low-cost and affordable units, Malay Reserve land and single or one-and-a-half-storey terraces are closed to foreigners. Here the developer states the project is not available to non-Malaysian citizens, the land carries a restriction in interest against sale to non-citizens without state consent, and the Phase 4 and 5A pages list Bumiputera lots only, so foreigners should look elsewhere. Check another project with Can a foreigner buy it?

What homes are there, and at what prices?

All 253 homes are freehold double-storey terraces of about 2,072 to 2,821 sq ft with up to four bedrooms. The advertising permits give RM685,000 to RM1,236,500 for Phase 4, RM809,500 to RM1,530,600 for Phase 5 and RM706,000 to RM1,235,300 for Phase 6.

Berapa harga Aspira LakeHomes dan bila siap?

Julat harga dalam permit iklan ialah RM685,000 hingga RM1,530,600 bagi Fasa 4 hingga 6 (laman permit UEM Sunrise, Oktober 2026). Semua rumah teres dua tingkat pegangan bebas, dijangka siap April 2027 (Fasa 4 dan 6) dan September 2027 (Fasa 5). Tidak dibuka kepada bukan warganegara.

Aspira LakeHomes 价格多少?什么时候完工?

根据UEM Sunrise公布的广告准证,第4至6期价格约RM68.5万至RM153万,均为永久地契双层排屋,面积约2,072至2,821平方尺。预计第4、6期2027年4月完工,第5期2027年9月完工。外国人不可购买。

Which schools are near Aspira LakeHomes?

On map data, the nearest schools are SK Ladang Pendas (~900 m), Raffles American International School (~2.7 km). Distances are straight-line from the building.

Is there a train or bus station near Aspira LakeHomes?

The nearest stations on map data are Gelang Patah Bus Terminal (~3.3 km).

What is the nearest hospital and mall to Aspira LakeHomes?

The nearest hospital on map data is Afiniti Wellness (~4.7 km), and the nearest mall is Big Box Retail Park (~4.4 km).

Get the current price list and units available at Aspira LakeHomes

Prices move and the better units go first. Tell me your budget and whether you are buying to live in or to rent out, and I will send back the units that fit, not a generic brochure.

Buying, selling or renting: one conversation, no obligation.

JL

Jason Lim

10 years in Malaysian property · Johor Bahru & Kuala Lumpur · REN 84424 · IQI Realty Sdn. Bhd. E (1) 1584/6

I work with local families, investors and buyers from Singapore and overseas. If a project is not right for what you need, I will say so; that is usually worth more than the brochure.

Message Jason

Last checked 15 October 2026 against the sources listed. Sources: UEM Sunrise permits and licences page and Aspira LakeHomes Phase 4 and 5A project pages (Oct 2026); UEM Sunrise Aspira LakeHomes brochure for the earlier phases; The Edge (launch report, 2024); PropertyGuru Aspira LakeHomes page (Oct 2026). KPKT TEDUH could not be loaded. Unit availability, prices and completion dates are set by the developer or owner and can change. This page is general information, not an offer, valuation or legal advice.

Explore related topics

Aspira LakeHomesFreehold · 2,072–2,821 sq ft · RM685,000–1,530,600 on permit
WhatsApp